Content
Activity
12/13/2013
-
updated by
Robin Wagner on 12/13/2013 07:43 PM -
Comment added
Hi Niels,
I’m not sure whether it is desirable to have the permission to edit the comments of other users.
Since changes...
- Assignee set to Niels Lindenthal
-
Comment added
-
Bug OP-928: [Project management] Page not found when adding/deleting members and clicking paginationupdated by
Robin Wagner on 12/13/2013 06:48 PM -
Comment added
Moved to Shortlist OPF Team as a suggestion for the next sprint.
- Status changed from confirmed to new
- Version deleted ()
-
Comment added
-
updated by
Robin Wagner on 12/13/2013 06:45 PM -
Comment added
Ticket is a duplication of .
I’m rejecting the ticket since the issue is solved.
- Status changed from new to rejected
- Version deleted ()
-
Comment added
-
updated by
Niels Lindenthal on 12/13/2013 05:20 PM - Version deleted ()
- Accountable set to Nils Kenneweg
-
created by
Robin Wagner on 12/13/2013 05:09 PM -
updated by
Robin Wagner on 12/13/2013 04:45 PM - Status changed from merged to closed
- Assignee deleted (
Johannes Wollert) - Accountable deleted (
Nils Kenneweg)
-
updated by
Robin Wagner on 12/13/2013 04:45 PM - Status changed from confirmed to closed
-
updated by
Robin Wagner on 12/13/2013 04:35 PM - Status changed from merged to closed
- Assignee deleted (
Hagen Schink)
-
updated by
Hagen Schink on 12/13/2013 04:34 PM - Status changed from merged to closed
-
updated by
Robin Wagner on 12/13/2013 04:34 PM -
Comment added
Works on deployed QA system.
- Status changed from merged to closed
- Assignee deleted (
Hagen Schink)
-
Comment added
-
updated by
Sebastian Schuster on 12/13/2013 04:31 PM -
Comment added
Works.
- Status changed from merged to closed
-
Comment added
-
updated by
Michael Frister on 12/13/2013 04:27 PM -
Comment added
Project navigation has a brighter look.
- Status changed from merged to closed
-
Comment added
-
updated by
Nils Kenneweg on 12/13/2013 04:17 PM -
Comment added
Guys this one is a duplicate and there is already a PR for the other bug.
-
Comment added
-
updated by
Michael Frister on 12/13/2013 04:17 PM -
Comment added
No more 500.
- Status changed from merged to closed
-
Comment added
-
updated by
Michael Frister on 12/13/2013 04:15 PM -
Comment added
Links to work packages in search results are correct now.
- Status changed from merged to closed
-
Comment added
-
updated by
Christian Ratz on 12/13/2013 04:11 PM - Status changed from merged to closed
-
updated by
Christian Ratz on 12/13/2013 04:06 PM - Status changed from merged to closed
- Assignee deleted (
Johannes Wollert)
-
updated by
Sebastian Schuster on 12/13/2013 04:01 PM -
Comment added
Moving it to Kanban according to the policy specification.
- Version deleted ()
-
Comment added
-
updated by
Markus Kahl on 12/13/2013 03:54 PM - Type set to Bug
- Project set to OpenProject
- Subject set to Activity default value makes log time required
- Description set (Details)
- Status set to new
- Priority set to Medium
- Version set to Product Backlog
- Author set to Markus Kahl
- % Complete set to 0%
- Story Points changed from 0 to 3
- Scheduling mode set to Automatic
- Working days set to include non-working days
- File log-time-without-default-highlight.png added as attachment
- File log-time-with-default-highlight.png added as attachment
- File log-time-invalid.png added as attachment
- Bug found in version set to (deleted option)
-
updated by
Hagen Schink on 12/13/2013 03:47 PM - Status changed from new to confirmed
- Assignee deleted (
Hagen Schink) - Story Points changed from 0 to 5
-
updated by
Robin Wagner on 12/13/2013 03:42 PM -
Comment added
Moved to Shortlist to be evaluated for next sprint.
- Status changed from confirmed to new
- Version deleted ()
-
Comment added
-
updated by
Sebastian Schuster on 12/13/2013 03:40 PM -
Comment added
Putting it back into the Sprint Backlog, hoping Johannes will have time to look at it again.
- Version deleted ()
-
Comment added
-
updated by
Niels Lindenthal on 12/13/2013 03:37 PM -
Comment added
Status developed since it expected to be fixed with OP-951. Needs to be tested. Set estimation to zero since the effort ...
- Status changed from confirmed to needs review
- Version deleted ()
- Accountable set to Hagen Schink
- Story Points changed from 2 to 0
-
Comment added
-
updated by
Niels Lindenthal on 12/13/2013 03:34 PM -
Comment added
Just talked with Hagen and Robin. We decided that the reources reserved for the Kanban process should take care of this....
- Assignee changed from Hagen Schink to Johannes Wollert
- Version deleted ()
- Accountable set to Hagen Schink
-
Comment added
-
updated by
Niels Lindenthal on 12/13/2013 03:33 PM -
Comment added
Just talked with Hagen and Robin. We decided that the reources reserved for the Kanban process should take care of this....
- Assignee changed from Hagen Schink to Johannes Wollert
- Version deleted ()
- Accountable set to Hagen Schink
-
Comment added
-
updated by
Niels Lindenthal on 12/13/2013 03:16 PM - Assignee set to Hagen Schink
- Version deleted ()
- Accountable set to Hagen Schink
-
updated by
Hagen Schink on 12/13/2013 03:13 PM - Version deleted ()
- Story Points changed from 0 to 2
-
updated by
Niels Lindenthal on 12/13/2013 11:41 AM - Assignee set to Hagen Schink
- Version deleted ()
-
updated by
Niels Lindenthal on 12/13/2013 11:40 AM - Assignee set to Hagen Schink
- Version deleted ()
-
updated by
Philipp Tessenow on 12/13/2013 10:24 AM -
Comment added
merged
- Status changed from on hold to merged
- Assignee deleted (
Markus Kahl)
-
Comment added
-
updated by
Johannes Wollert on 12/13/2013 10:02 AM -
Comment added
No having a look just now, as Sir Schuster wants me to do something else first.
- Status changed from in development to confirmed
- Assignee changed from Johannes Wollert to Nils Kenneweg
- Version deleted ()
-
Comment added
-
updated by
Johannes Wollert on 12/13/2013 09:57 AM -
Comment added
I’ll have a look.
- Status changed from confirmed to in development
- Assignee changed from Nils Kenneweg to Johannes Wollert
- Version deleted ()
- Story Points changed from 0 to 5
-
Comment added
-
updated by
Philipp Tessenow on 12/13/2013 09:13 AM -
Comment added
I gave you some feedback in the pul request. so i’ll put this wp ‘on hold’
- Status changed from needs review to on hold
-
Comment added
-
updated by
Hagen Schink on 12/13/2013 07:57 AM -
Comment added
This bug should be fixed with ticket OP-951.
- Status changed from new to confirmed
-
Comment added
12/12/2013
-
updated by
Robin Wagner on 12/12/2013 06:21 PM - Type set to Bug
- Project set to OpenProject
- Subject set to [Activity] Wrong link to work package journals causes page not found
- Description set (Details)
- Status set to new
- Priority set to High
- Version deleted ()
- Author set to Robin Wagner
- % Complete set to 0%
- Scheduling mode set to Automatic
- Working days set to include non-working days
- File Bug_Anchor-note.png added as attachment
- Bug found in version set to (deleted option)
-
updated by
Jens Ulferts on 12/12/2013 04:08 PM -
Comment added
The plugin-features of our CI are fixed. It had nothing to do with ruby 2.0 as it was already broken on ruby 1.9 as well...
-
Comment added
-
updated by
Jens Ulferts on 12/12/2013 03:59 PM -
Comment added
Based on what I see in the code the following search parameters are supported:
Searching in all the projects
Searching ...
- Story Points changed from 0 to 3
-
Comment added
-
updated by
Birthe Lindenthal on 12/12/2013 02:53 PM -
Comment added
Hi Ratzi,
I have added an additional acceptance criteria for the clean-up. We can have a chat about this.
- Description changed (Details)
-
Comment added
-
updated by
Jens Ulferts on 12/12/2013 11:03 AM - Status changed from specified to in development
- Assignee set to Jens Ulferts
-
updated by
Hagen Schink on 12/12/2013 09:53 AM -
Comment added
Jens told me that after consultation with Niels this is not an issue anymore.
- Status changed from on hold to rejected
- Assignee deleted (
Niels Lindenthal)
-
Comment added
-
updated by
Hagen Schink on 12/12/2013 08:49 AM - Status changed from needs review to merged
- Assignee deleted (
Hagen Schink)
12/11/2013
-
updated by
Johannes Wollert on 12/11/2013 04:58 PM - Status changed from needs review to merged
-
updated by
Hagen Schink on 12/11/2013 04:45 PM -
Comment added
PR 749
Consider PR 33 for openproject-meetings and PR 71 for openproject-costs too.
- Status changed from in development to needs review
-
Comment added
-
updated by
Hagen Schink on 12/11/2013 04:35 PM -
Comment added
I put this into the current sprint 17 because it is an important code quality degradation that needs to be handled as so...
- Type changed from Task to Feature
- Description changed (Details)
- Status changed from new to in development
- Assignee set to Hagen Schink
- Version deleted ()
- Story Points changed from 0 to 8
-
Comment added
-
updated by
Sebastian Schuster on 12/11/2013 04:35 PM - Status changed from needs review to merged
-
updated by
Johannes Wollert on 12/11/2013 03:57 PM -
Comment added
I’ve stumbled across this while working on OP-929 and it proved to be a major annoyance (due to non-descriptive error me...
- Status changed from confirmed to needs review
- Assignee set to Johannes Wollert
- Version deleted ()
- Story Points changed from 0 to 1
-
Comment added
-
updated by
Johannes Wollert on 12/11/2013 03:51 PM -
Comment added
This was caused by a configuration error on the preview instance (and missing callbacks when changing settings?): work p...
- Status changed from on hold to merged
-
Comment added
-
updated by
Markus Kahl on 12/11/2013 03:12 PM -
Comment added
Done. Mind reviewing it again?
- Status changed from on hold to needs review
- Assignee changed from Markus Kahl to Hagen Schink
-
Comment added
-
updated by
Hagen Schink on 12/11/2013 02:43 PM -
Comment added
PR 747
- Status changed from in development to needs review
-
Comment added
-
created by
Robin Wagner on 12/11/2013 01:46 PM -
updated by
Jens Ulferts on 12/11/2013 01:36 PM - Status changed from needs review to merged
-
updated by
Jens Ulferts on 12/11/2013 01:36 PM - Status changed from needs review to merged
-
updated by
Hagen Schink on 12/11/2013 12:58 PM - Status changed from confirmed to in development
- Assignee set to Hagen Schink
-
updated by
Hagen Schink on 12/11/2013 12:44 PM - Status changed from needs review to merged
-
updated by
Hagen Schink on 12/11/2013 11:47 AM - Status changed from needs review to merged
-
updated by
Hagen Schink on 12/11/2013 11:43 AM -
Comment added
As the error is related to the one described in OP-939, I just fixed this bug as well. So, I move this ticket to sprint ...
- Status changed from confirmed to needs review
- Assignee set to Hagen Schink
- Version deleted ()
- Story Points changed from 0 to 0
-
Comment added
-
updated by
Hagen Schink on 12/11/2013 11:40 AM -
Comment added
PR 746
- Status changed from in development to needs review
-
Comment added
-
updated by
Johannes Wollert on 12/11/2013 11:23 AM -
Comment added
Fixed and rebased the PR, should work as expected now.
- Status changed from in development to needs review
-
Comment added
-
updated by
Hagen Schink on 12/11/2013 10:38 AM - Status changed from confirmed to in development
- Assignee set to Hagen Schink
-
updated by
Hagen Schink on 12/11/2013 09:57 AM -
Comment added
Johannes is going to solve this issue.
- Status changed from on hold to in development
- Assignee changed from Nils Kenneweg to Johannes Wollert
-
Comment added
-
updated by
Jens Ulferts on 12/11/2013 09:50 AM - Project changed from OpenProject Foundation to OpenProject
-
updated by
Jens Ulferts on 12/11/2013 09:50 AM - Project changed from OpenProject Foundation to OpenProject
-
updated by
Christian Ratz on 12/11/2013 09:17 AM - Status changed from needs review to merged
- Assignee deleted (
Hagen Schink)
-
updated by
Hagen Schink on 12/11/2013 09:08 AM -
Comment added
Hi Nils,
are there information missing or is this ticket already specified? If the latter is true, can you please provid...
- Assignee set to Nils Kenneweg
- Version deleted ()
-
Comment added
-
updated by
Hagen Schink on 12/11/2013 08:50 AM -
Comment added
Hello Nils,
I just had a look into your PR. It looks OKish, although the border behavior is still a bit different (see t...
- Status changed from needs review to on hold
- File 3072_Chrome_FF_IE.PNG added as attachment
-
Comment added
-
updated by
Hagen Schink on 12/11/2013 08:39 AM -
Comment added
Hello Markus,
as “mentioned already by Nils”, the PR still misses tests and a changelog entry. Can you provide those?
Th...
- Status changed from needs review to on hold
-
Comment added
-
updated by
Hagen Schink on 12/11/2013 08:33 AM -
Comment added
Cukes are failing, so I set the status on “On Hold”.
- Status changed from needs review to on hold
-
Comment added
12/10/2013
-
updated by
Robin Wagner on 12/10/2013 07:12 PM -
Comment added
The same error occurs when copying several work packages from the work package list at the same time (“Bulk edit/copy”).
-
Comment added
-
created by
Robin Wagner on 12/10/2013 06:51 PM -
updated by
Robin Wagner on 12/10/2013 04:59 PM - Description changed (Details)
- File Bug_Settings-Members.png added as attachment
-
updated by
Jens Ulferts on 12/10/2013 04:24 PM - Project changed from OpenProject Foundation to OpenProject
-
updated by
Jens Ulferts on 12/10/2013 04:23 PM - Project changed from OpenProject Foundation to OpenProject
-
Bug OP-928: [Project management] Page not found when adding/deleting members and clicking paginationupdated by
Robin Wagner on 12/10/2013 04:20 PM -
Comment added
Additional information:
The structure of the link in the pagination changes when adding a member to a project.
Example...
-
Comment added
-
updated by
Jens Ulferts on 12/10/2013 04:16 PM - Version deleted ()
-
updated by
Christian Ratz on 12/10/2013 04:14 PM -
Comment added
Done in this PR
- Status changed from in development to needs review
- Assignee deleted (
Christian Ratz) - Story Points changed from 1 to 3
-
Comment added
-
created by
Jonas Heinrich (Finn) on 12/10/2013 03:42 PM -
updated by
Jens Ulferts on 12/10/2013 03:11 PM - Assignee changed from Niels Lindenthal to Markus Kahl
-
updated by
Jonas Heinrich (Finn) on 12/10/2013 02:25 PM -
Comment added
A user can have the right to edit replies of other users. I just tested if the user can still do so when he does not hav...
- Status changed from confirmed to rejected
-
Comment added
-
updated by
Jonas Heinrich (Finn) on 12/10/2013 02:13 PM - Subject changed from [Forum] Replies of other user can be edited to [Forums] Replies of other user can be edited
-
updated by
Birthe Lindenthal on 12/10/2013 11:54 AM - Status changed from specified to in development
-
updated by
Nils Kenneweg on 12/10/2013 11:49 AM -
Comment added
PR: https://github.com/opf/openproject/pull/740
- Status changed from in development to needs review
-
Comment added
-
created by
Nils Kenneweg on 12/10/2013 11:42 AM -
created by
Nils Kenneweg on 12/10/2013 11:37 AM -
updated by
Hagen Schink on 12/10/2013 10:16 AM - Status changed from merged to closed
-
updated by
Hagen Schink on 12/10/2013 10:16 AM -
Comment added
Till tested it by running it.
- Status changed from merged to closed
-
Comment added
-
updated by
Robin Wagner on 12/10/2013 09:54 AM - Description changed (Details)
-
updated by
Birthe Lindenthal on 12/10/2013 09:49 AM -
Comment added
Move this ticket to OpenProject.
- Type set to Feature
- Project set to OpenProject
- Subject set to [Design] Implement new look for header and project navigation
- Description set (Details)
- Status set to specified
- Assignee set to Christian Ratz
- Priority set to Medium
- Version deleted ()
- Author set to Birthe Lindenthal
- % Complete set to 0%
- Parent set to New look for header and project navigation
- Accountable set to Birthe Lindenthal
- Story Points changed from 0 to 1
- Scheduling mode set to Automatic
- Working days set to include non-working days
-
Comment added
12/09/2013
-
updated by
Niels Lindenthal on 12/09/2013 08:04 PM - Subject changed from Copying OpenProject causes a lot of validation errors to Copying the project OpenProject on OpenProject.org causes a lot of validation errors
- Assignee set to Johannes Wollert
- Version deleted ()
-
updated by
Niels Lindenthal on 12/09/2013 07:51 PM - Accountable set to Sebastian Schuster
-
updated by
Niels Lindenthal on 12/09/2013 07:50 PM - Accountable set to Christian Ratz
-
updated by
Niels Lindenthal on 12/09/2013 07:49 PM - Accountable set to Christian Ratz
-
updated by
Markus Kahl on 12/09/2013 07:28 PM - Description changed (Details)
- Status changed from confirmed to needs review
-
updated by
Birthe Lindenthal on 12/09/2013 07:25 PM -
Comment added
Since the description and acceptance criteria had been changed, I do not quite agree with this new requirement.
I prefer...
- Description changed (Details)
- Assignee changed from Birthe Lindenthal to Niels Lindenthal
-
Comment added
-
updated by
Markus Kahl on 12/09/2013 06:28 PM - Description changed (Details)
- Status changed from in development to needs review
-
updated by
Jonas Heinrich (Finn) on 12/09/2013 05:55 PM - Description changed (Details)
-
updated by
Robin Wagner on 12/09/2013 05:37 PM - Description changed (Details)
- File Bug_CustomField-Name.PNG added as attachment
-
created by
Robin Wagner on 12/09/2013 05:21 PM -
updated by
Nils Kenneweg on 12/09/2013 05:07 PM - Status changed from confirmed to in development
-
created by
Robin Wagner on 12/09/2013 04:58 PM -
updated by
Nils Kenneweg on 12/09/2013 04:46 PM -
Comment added
PR: https://github.com/opf/openproject/pull/735
- Status changed from in development to needs review
-
Comment added
-
updated by
Jan Sandbrink on 12/09/2013 04:39 PM - Status changed from new to confirmed
- Version deleted ()
-
updated by
Birthe Lindenthal on 12/09/2013 04:39 PM - Story Points changed from 25 to 21
-
updated by
Jan Sandbrink on 12/09/2013 04:37 PM -
Comment added
not reproducable anymore
- Status changed from new to rejected
- Version deleted ()
-
Comment added
-
updated by
Jan Sandbrink on 12/09/2013 04:36 PM - Version deleted (
Product Backlog)
- Version deleted (
-
updated by
Jan Sandbrink on 12/09/2013 04:34 PM - Version deleted ()
-
updated by
Jan Sandbrink on 12/09/2013 04:33 PM - Version deleted ()
-
updated by
Jan Sandbrink on 12/09/2013 04:33 PM - Version deleted ()
-
updated by
Jan Sandbrink on 12/09/2013 04:33 PM - Version deleted ()
-
updated by
Jan Sandbrink on 12/09/2013 04:32 PM - Version deleted ()
-
updated by
Nils Kenneweg on 12/09/2013 04:29 PM -
Comment added
The reported project status is already available inline when calling
instance/api/v2/projects/17/reportings.xml
- Status changed from specified to rejected
-
Comment added
-
updated by
Nils Kenneweg on 12/09/2013 04:18 PM - Story Points changed from 0 to 5
-
updated by
Nils Kenneweg on 12/09/2013 04:15 PM -
Comment added
This should be specified and be seperated into several user stories.
- Status changed from specified to new
- Assignee set to Jan Sandbrink
-
Comment added
-
updated by
Robin Wagner on 12/09/2013 04:10 PM - Description changed (Details)
- File Bug_WP-status.png added as attachment
-
updated by
Jonas Heinrich (Finn) on 12/09/2013 04:02 PM -
Comment added
Hi Nils,
should we change the target version to Backlog - Unspecified?
Best,
Jonas
-
Comment added
-
updated by
Nils Kenneweg on 12/09/2013 03:53 PM - Story Points changed from 0 to 8
-
updated by
Nils Kenneweg on 12/09/2013 03:48 PM - Story Points changed from 0 to 2
-
updated by
Nils Kenneweg on 12/09/2013 03:45 PM - Status changed from new to confirmed
- Story Points changed from 0 to 5
-
updated by
Nils Kenneweg on 12/09/2013 03:31 PM -
Comment added
In my opinion it should be 403 if no API is available and 401 if we are not authorized.
See http://en.wikipedia.org/wiki...
- Description changed (Details)
- Story Points changed from 0 to 3
-
Comment added
-
updated by
Nils Kenneweg on 12/09/2013 03:24 PM - Story Points changed from 3 to 5
-
updated by
Nils Kenneweg on 12/09/2013 03:22 PM -
Comment added
Those names are also used in other places.
- Status changed from specified to rejected
-
Comment added
-
updated by
Nils Kenneweg on 12/09/2013 03:07 PM -
Comment added
I will create a PR in a minute.
- Status changed from new to in development
- Version deleted ()
- Accountable set to Nils Kenneweg
- Story Points changed from 0 to 5
- Bug found in version set to (deleted option)
-
Comment added
-
updated by
Birthe Lindenthal on 12/09/2013 02:04 PM - Subject changed from Clean-up and refactoring existing CSS for content area to [Design] Clean-up and refactoring existing CSS for content area
- Version deleted ()
-
updated by
Birthe Lindenthal on 12/09/2013 12:06 PM -
Comment added
Hi Ratzi,
can you please check this ticket if all requirements are clear for the next sprint (estimation 25 story point)...
- Type set to Feature
- Project set to OpenProject
- Subject set to Clean-up and refactoring existing CSS for content area
- Description set (Details)
- Status set to specified
- Assignee set to Christian Ratz
- Priority set to Medium
- Version deleted ()
- Author set to Birthe Lindenthal
- % Complete set to 0%
- Story Points changed from 0 to 25
- Scheduling mode set to Automatic
- Working days set to include non-working days
-
Comment added
-
created by
Jonas Heinrich (Finn) on 12/09/2013 11:59 AM -
updated by
Niels Lindenthal on 12/09/2013 11:52 AM - Assignee changed from Till Breuer to Birthe Lindenthal
- Accountable set to Till Breuer
-
updated by
Robin Wagner on 12/09/2013 11:46 AM - Priority changed from Medium to High
-
updated by
Hagen Schink on 12/09/2013 11:08 AM -
Comment added
This is planned for the MyProject team
- Version deleted (
Product Backlog)
-
Comment added
-
updated by
Markus Kahl on 12/09/2013 11:06 AM - Version set to Product Backlog
- Story Points changed from 0 to 3
-
updated by
Nils Kenneweg on 12/09/2013 11:01 AM - Subject changed from Autocompleter broken multiple times in timelines edit to [Timelines] Autocompleter broken multiple times in timelines edit
-
updated by
Till Breuer on 12/09/2013 10:57 AM -
Comment added
We can already add a public global query ‘All work packages’, which fulfills the acceptance criteria.
We should specify ...
- Status changed from in development to on hold
-
Comment added
-
created by
Alexander Bach on 12/09/2013 10:56 AM -
updated by
Hagen Schink on 12/09/2013 10:36 AM -
Comment added
I move this to Sprint 17 because it has no progress.
- Version deleted ()
-
Comment added
-
updated by
Till Breuer on 12/09/2013 10:19 AM - Status changed from specified to in development
- Version deleted ()
-
updated by
Markus Kahl on 12/09/2013 10:16 AM - Status changed from confirmed to in development
-
updated by
Jonas Heinrich (Finn) on 12/09/2013 10:16 AM -
Comment added
Hi Jens,
before I set this filter some work packages are displayed in the timeline.
I also clarified the filter in the d...
- Description changed (Details)
-
Comment added
-
updated by
Christian Ratz on 12/09/2013 10:01 AM - Status changed from merged to closed
-
updated by
Jan Sandbrink on 12/09/2013 09:56 AM -
Comment added
Hi Niels,
Markus and I estimated this ticket and it is now ready to be prioritized/pushed into the sprint.
Best regards
...
- Status changed from new to confirmed
- Assignee changed from Markus Kahl to Niels Lindenthal
- Version set to Product Backlog
- Story Points changed from 0 to 1
-
Comment added
-
updated by
Sebastian Schuster on 12/09/2013 09:47 AM -
Comment added
Although it is still slow, there are not a lot of validation errors anymore. However,
there are still validation errors ...
- Subject changed from Copying OpenProject is slow and causes a lot of validation errors to Copying OpenProject causes a lot of validation errors
- Status changed from merged to on hold
- Version deleted ()
- File screenshot.png added as attachment
-
Comment added
-
updated by
Sebastian Schuster on 12/09/2013 09:37 AM -
Comment added
Setting this to closed. We will QA this automatically when deploying the next production systems.
- Status changed from merged to closed
- Assignee deleted (
Jens Ulferts)
-
Comment added
-
updated by
Sebastian Schuster on 12/09/2013 09:36 AM - Version deleted ()
-
updated by
Sebastian Schuster on 12/09/2013 09:35 AM - Status changed from merged to closed
-
updated by
Sebastian Schuster on 12/09/2013 09:35 AM -
Comment added
Automatisch durch die Änderungen in OP-519 aktualisert
- % Complete changed from 79% to 86%
-
Comment added
-
updated by
Sebastian Schuster on 12/09/2013 09:35 AM - Status changed from merged to closed
-
updated by
Sebastian Schuster on 12/09/2013 09:35 AM - Status changed from merged to closed
-
updated by
Niels Lindenthal on 12/09/2013 09:35 AM -
Comment added
Hi Markus,
please have a look at this and do the estimation?
Thanks
Niels
- Assignee set to Markus Kahl
- Priority changed from Medium to High
- Accountable set to Markus Kahl
-
Comment added
-
updated by
Sebastian Schuster on 12/09/2013 09:35 AM - Status changed from merged to closed
-
updated by
Sebastian Schuster on 12/09/2013 09:34 AM - Status changed from merged to closed
-
updated by
Nils Kenneweg on 12/09/2013 09:32 AM - Description changed (Details)
-
updated by
Niels Lindenthal on 12/09/2013 09:31 AM - Assignee set to Markus Kahl
- Version deleted ()
- Accountable set to Markus Kahl
-
created by
Nils Kenneweg on 12/09/2013 09:24 AM -
updated by
Hagen Schink on 12/09/2013 07:50 AM -
Comment added
QAed during the sprint review.
- Status changed from merged to closed
-
Comment added
-
updated by
Hagen Schink on 12/09/2013 07:50 AM -
Comment added
QAed during the sprint review.
- Status changed from merged to closed
-
Comment added
-
updated by
Hagen Schink on 12/09/2013 07:50 AM -
Comment added
QAed during the sprint review.
- Status changed from merged to closed
-
Comment added
-
updated by
Hagen Schink on 12/09/2013 07:47 AM -
Comment added
QAed during the sprint review.
- Status changed from merged to closed
-
Comment added
Also available in: Atom