Roadmap

Version New version

OpenProject - 18.0.0

58% Total progress

501 closed (57%)   374 open (43%)

Related work packages

OpenProject - Product Backlog

32% Total progress

178 closed (32%)   383 open (68%)

Related work packages

  • Feature SPAR-111: Add dialog when linking a manually scheduled work package as successor
  • Feature SPAR-112: Add dialog when successor must switch to manual mode to preserve its dates

wih

There are currently no work packages assigned to this version.


OpenProject - Wish List

12% Total progress

335 closed (12%)   2499 open (88%)

Related work packages

  • Epic SPAR-2: Communicate the critical path as part of the project timeline (MVP)
  • Epic SPAR-5: Schedule from the project start date/project finish date (backwards planning)
  • Feature SPAR-3: Adding new columns for relations
  • Feature SPAR-4: Show child work packages from other projects in work package view
  • Feature SPAR-6: Sum spent time on working package view for all and for subgroups
  • Feature SPAR-7: Inherited Attributes for New Children
  • Feature SPAR-8: Enable manual scheduling of parent work packages directly from within Gantt chart
  • Feature SPAR-9: Enter and show Estimated time in days
  • Feature SPAR-10: Template or copy a task cluster with all relations
  • Feature SPAR-11: Do not set relation to original work package when copying work package
  • Feature SPAR-12: Follower work package should start earlier if the predecessor finished prematurely
  • Feature SPAR-13: Bulk edit to unset start/finish date
  • Feature SPAR-16: Filter option is not available in Child tickets
  • Feature SPAR-17: Feature/Epic Links in User Story Cards
  • Feature SPAR-18: Cross Team dependencies shown in user stories
  • Feature SPAR-20: Work package "Done ratio" calculation of parent work package
  • Feature SPAR-24: Disable following work packages from automatically deriving dates when preceding one is moved
  • Feature SPAR-25: Expand task relations for URL and WiKi pages
  • Feature SPAR-26: Ansicht in Untergeordnete Arbeitspakete anpassen. Support Anfrage (#3229) (#3241)
  • Feature SPAR-27: Follows / Precedes relationship adds unneccesary days to work packages
  • Feature SPAR-29: Allow parent and children to be in "blocks/blocked by" relationship
  • Feature SPAR-30: Specify relation type in journalised activity entries for dates changes caused by relations
  • Feature SPAR-62: Show reported values for work and remainig work and % complete in the versions detail page
  • Feature SPAR-66: Project-level setting for % Complete calculation mode
  • Feature SPAR-75: Remove work and progress estimates from type Milestone
  • Feature SPAR-76: Progress: Clicking on "% Complete" displays the Progress and Work estimates and progress pop-over
  • Feature SPAR-77: Add Work, Remaining work and % complete to baseline comparison
  • Feature SPAR-82: Enable/Disable "Progress calculation" at a project-level
  • Feature SPAR-95: Primerised version overview page with progress indicators
  • Feature SPAR-103: Allow "Start as soon as possible" to align with project or stage start dates
  • Feature SPAR-152: Date picker: when a user manually enters a non-working day (and working days only is on), show an inline error message
  • Feature SPAR-159: Show indirect relations (successors/predecessors) in relations tab
  • Feature SPAR-257: Make it possible to include or exclude working days when defining lag per relation
  • Feature SPAR-275: Add an admin setting to turn off Automatic scheduling mode
  • Feature SPAR-279: Set a maximum duration for work packages
  • Feature SPAR-285: closed Visual baseline comparison in the Gantt chart