Content
Roadmap
0.3.1-beta
Start date 04/29/2026
Finish date 05/27/2026
5 days late
Related work packages
- Feature SMA-430: closed Speech to text functionality
- Feature SMA-827: closed Add scroll bars and back to top on lists
- Feature SMA-838: closed Fill the previous used instance URL in the field by default
- Feature SMA-845: closed Use OS long-tap actions on text and images in work packages
- Feature SMA-918: closed Mark as read notifications more accessible on work packages with notifications active
- Feature SMA-927: closed Include a search bar to the Activity field when login time
- Feature SMA-931: closed Implement Firebase ID opt-in modal and settings entry
0.3.2-beta
Start date 05/27/2026
Finish date 06/24/2026
Due in 23 days
Related work packages
- Feature SMA-620: closed Recently viewed work packages home widget
- Feature SMA-765: closed Add work packages to native calendars
- Feature SMA-915: Display cache data banner to the user after first login
- Feature SMA-930: Work package project identifiers in the mobile
- Feature SMA-945: [Mobile Meetings] Index pages
- Feature SMA-946: [Mobile Meetings] Agendas, status and outcomes
0.3.3-beta
Start date 06/24/2026
Finish date 07/22/2026
Due in 51 days
0 closed (0%) 14 open (100%)
Related work packages
- Epic SMA-549: Meeting module available in the app
- Feature SMA-248: Login improvements
- Feature SMA-500: Workspaces - Project lifecycle
- Feature SMA-548: Add work package with dates and meetings to native calendar apps
- Feature SMA-836: Setting to define default opening work package query
- Feature SMA-895: Allow users to quick filter and advance filter work packages lists
- Feature SMA-896: Allow users to save as work packages lists and modify its visibility
- Feature SMA-947: [Mobile Meetings] Details, participants and attachments
- Feature SMA-948: [Mobile Meetings] Presentation mode
- Feature SMA-954: [Mobile Meetings] Backlogs
- Feature SMA-955: [Mobile Meetings] Creation of one-time and recurring meetings
- Feature SMA-956: [Mobile Meetings] Edit series templates
- Feature SMA-957: [Mobile Meetings] Add meetings tab to work packages details view
1.0.0
Start date 07/22/2026
Finish date 08/26/2026
Due in about 3 months
0 closed (0%) 6 open (100%)
Related work packages
- Feature SMA-431: Create a work package through Siri/Google assistant
- Feature SMA-546: What's new (release notes) in the app
- Feature SMA-554: Offline capabilty
- Feature SMA-563: Export functionalities
- Feature SMA-844: Add haptic callbacks
- Feature SMA-857: Personal planner (own sandbox with to-dos, notes...)
1.0.1
Start date 07/29/2026
Finish date 08/26/2026
Due in about 3 months
0 closed (0%) 3 open (100%)
Related work packages
- Feature SMA-551: Document scan to text (e.g. work package description)
- Feature SMA-556: Access Nextcloud/Sharepoint files from the app
- Feature SMA-861: Calendar module in the app
Mobile Product Backlog
Related work packages
- Epic SMA-45: closed Work package tab - Redesign and UX improvements
- Epic SMA-129: closed Dependencies and code clean up
- Epic SMA-247: Realtime push notifications
- Epic SMA-519: Code review of current app status
- Feature SMA-34: closed Moving the type selection from the form to the header
- Feature SMA-100: closed Redesign and improve how notifications get marked as read in the activity tab
- Feature SMA-170: closed Define and implement OpenProject version handling between apps
- Feature SMA-209: Add deep-linking for different instances (including on-premises)
- Feature SMA-269: Ghost relations available in mobile
- Feature SMA-273: closed Increase the comments box vertical space
- Feature SMA-333: closed It is impossible to save the wp before mandatory fields are filled in (i.e. inline error is missing)
- Feature SMA-351: closed Improve UI of fields in the overview page
- Feature SMA-417: closed Allow searching by work package ID
- Feature SMA-433: closed Work package module is search based
- Feature SMA-470: closed Display the default group of the query when it is Grouped by
- Feature SMA-496: closed Workspaces overview with graphs and tabs
- Feature SMA-550: closed Improve Crashlytics, analytics & reports
- Feature SMA-552: closed Accessibility - Screen reader and voiceover for visual impaired users
- Feature SMA-557: Access wikis from the app
- Feature SMA-575: closed Risk and Goals in mobile
- Feature SMA-738: OS Notification clarity and grouping enhancements
- Feature SMA-835: Bring project queries in the mobile app
- Feature SMA-847: Audio notes comments
- Feature SMA-848: Embedded video and audio on rich long text
- Feature SMA-850: Two-way calendar synchronization
- Feature SMA-852: In app photo editing (draw, mark...)
- Feature SMA-853: Stylus (e-pen) for drawing or writting
- Feature SMA-855: Boards in the mobile app, including Kanban
- Feature SMA-859: Team and resource planner in the app
- Feature SMA-860: Gantt chart in the mobile app
- Feature SMA-862: Change text editor to BlockNote
- Feature SMA-864: Access documents from the app
- Feature SMA-928: Log time for other users in the app
- Idea SMA-802: Performance of mobile app
Mobile Wish List
Related work packages
- Epic SMA-36: BIM Edition in the mobile app with IFC files
- Epic SMA-858: Agile implementation in the app (backlogs, sprints, burndown...)
- Feature SMA-90: closed Share work package
- Feature SMA-91: closed Move, copy and copy to other project functions
- Feature SMA-93: closed Thread reply on the activity tab
- Feature SMA-102: closed Improve the avatar API to allow changing it from the mobile app
- Feature SMA-112: closed Blue background visual aid when adding a comment, file, relation or watcher and creating a work package
- Feature SMA-197: closed Accept feedback from the mobile app
- Feature SMA-198: closed Secure feedback submission
- Feature SMA-199: closed Forward feedback to OpenProject
- Feature SMA-212: closed Make the Recent Work Packages about the user logged in and not about the instance
- Feature SMA-270: closed Add information about app in settings bundle in ios
- Feature SMA-272: closed Add an information about current instance near the sign out button
- Feature SMA-283: closed Improve and redesign the home page to make it relevant for the user
- Feature SMA-286: closed Double check available file types and how to visualise them in mobile
- Feature SMA-306: closed Group work package list by groups where available
- Feature SMA-405: closed More space for project names in home page
- Feature SMA-432: closed Planner in the mobile app
- Feature SMA-555: Multi-device app for all desktop OS
- Feature SMA-757: Phone landscape and tablet portrait UI
- Feature SMA-774: Login to the app with QR code
- Feature SMA-843: Progress indicators for background loading processes
- Feature SMA-849: Extend emojis available in comments
- Feature SMA-851: Personal productivity insight dashboard
- Feature SMA-856: Comments with threads in app
- Feature SMA-863: MCP in the mobile app for improved search
- Idea SMA-724: Ideas for future versions
- Feedback SMA-837: Dark mode is too harsh (with deep black)
OpenProject - Wish List
304 closed (11%) 2416 open (89%)
Related work packages
- Feature SMA-304: Dedicated project list with search
- Feature SMA-640: Allow taking or uploading image on WP creation
- Feature SMA-854: Performance optimisation: WebSocket connection [API]
- Idea SMA-766: Add a kanban board