Content
Activity
02/22/2018
-
updated by
mab internet on 02/22/2018 03:47 PM - Type set to Bug
- Project set to OpenProject
- Subject set to Error while browsing Git repositories with Tags
- Description set (Details)
- Status set to new
- Assignee set to Oliver Günther
- Priority set to High
- Version set to 7.4.2
- Author set to mab internet
- % Complete set to 0%
- Start date set to 02/22/2018
- Scheduling mode set to Automatic
- Working days set to include non-working days
- File 07_-_Git_repo_in_tag_-_not_working_link_for_sub_directory_error.png added as attachment
- File 03_-_Git_repo_in_master_-_working_link_for_downloading_file_in_sub_directory.png added as attachment
- File SSH_commands_to_populate_Git_repository.txt added as attachment
- File 05_-_Git_repo_in_master_-_choosing_tag_in_repository.png added as attachment
- File 06_-_Git_repo_in_tag_-_not_working_link_for_sub_directory.png added as attachment
- File 04_-_Git_repo_in_master_-_downloading_file_in_sub_directory.png added as attachment
- File 01_-_Git_repo_in_master_-_working_link_for_sub_directory.png added as attachment
- File 02_-_Git_repo_in_master_-_working_link_for_file_in_sub_directory.png added as attachment
- Bug found in version set to (deleted option)
-
updated by
Robin Wagner on 02/22/2018 03:30 PM -
Comment added
Hey Sandro,
thanks for reporting this.
Actually, there is another bug which tracks the same error: .
I therefore reject ...
- Status changed from new to rejected
-
Comment added
-
updated by
Robin Wagner on 02/22/2018 03:25 PM -
Comment added
Thanks for reporting the error, Morné.
Seems it is duplicated by #27726. Therefore, I’m rejecting this one.
- Status changed from new to rejected
-
Comment added
-
updated by
Morné Parsons on 02/22/2018 09:34 AM -
Comment added
Packaged installation on Ubuntu 16.04.3 LTS
To reproduce the error, is select a project from the “select a project” lis...
-
Comment added
-
updated by
Morné Parsons on 02/22/2018 09:24 AM -
Comment added
Some backround, i did restore from backup and since then we have issues.
One thing to note is that i did restore the DB ...
-
Comment added
-
updated by
Jens Ulferts on 02/22/2018 09:09 AM -
Comment added
Closing because of lack of information.
- Status changed from new to rejected
-
Comment added
-
updated by
Jens Ulferts on 02/22/2018 09:08 AM -
Comment added
For 8.0, we will apply the work packages table to the my page. That will enable you to add a block to the my page with a...
- Version changed from 7.4.2 to 8.0.0
-
Comment added
-
updated by
Jens Ulferts on 02/22/2018 09:06 AM -
Comment added
Hi Morné,
thanks for the bug report.
In order to fix the bug we will need far more information, most notably:
method of...
- Priority changed from High to Medium
- Version deleted (
7.4.2)
-
Comment added
02/21/2018
-
updated by
Jens Ulferts on 02/21/2018 05:13 PM -
Comment added
PR: https://github.com/opf/openproject/pull/6185
- Status changed from confirmed to needs review
-
Comment added
-
updated by
Jens Ulferts on 02/21/2018 05:11 PM - Status changed from needs review to merged
-
updated by
Jens Ulferts on 02/21/2018 05:10 PM -
Comment added
Sortable custom actions
Start date, due date, date, done ratio, estimated hours
- Description changed (Details)
-
Comment added
-
updated by
Sandro Santos on 02/21/2018 05:04 PM - Type set to Bug
- Project set to OpenProject
- Subject set to Soma de horas com erro
- Description set (Details)
- Status set to new
- Priority set to Immediate
- Author set to Sandro Santos
- % Complete set to 0%
- Scheduling mode set to Automatic
- Working days set to include non-working days
- File error.png added as attachment
-
updated by
Jens Ulferts on 02/21/2018 02:12 PM -
Comment added
PR: https://github.com/opf/openproject/pull/6185
- Description changed (Details)
- Status changed from in development to needs review
-
Comment added
-
updated by
Morné Parsons on 02/21/2018 01:50 PM - Type set to Bug
- Project set to OpenProject
- Subject set to Creating a work package results in error: "An Internal error has occured. [object Object]
- Description set (Details)
- Status set to new
- Priority set to High
- Version set to 7.4.2
- Author set to Morné Parsons
- % Complete set to 0%
- Start date set to 02/21/2018
- Scheduling mode set to Automatic
- Working days set to include non-working days
- File 1519217429658-0.png added as attachment
- Bug found in version set to (deleted option)
-
updated by
Morné Parsons on 02/21/2018 01:47 PM - Type set to Bug
- Project set to OpenProject
- Subject set to Creating a task results in error:
- Status set to new
- Priority set to Medium
- Author set to Morné Parsons
- % Complete set to 0%
- Scheduling mode set to Automatic
- Working days set to include non-working days
- File 1519217232784-0.png added as attachment
-
updated by
Jens Ulferts on 02/21/2018 01:08 PM - Description changed (Details)
- Status changed from confirmed to in development
- Assignee set to Jens Ulferts
-
updated by
Jens Ulferts on 02/21/2018 11:18 AM -
Comment added
Description added
- Description changed (Details)
-
Comment added
-
updated by
Jens Ulferts on 02/21/2018 11:17 AM -
Comment added
Notifications added
-
Comment added
-
updated by
Jens Ulferts on 02/21/2018 09:50 AM - Description changed (Details)
- Finish date changed from 02/14/2018 to 02/27/2018
- Status changed from new to in development
- Start date changed from 02/11/2018 to 02/19/2018
- Duration changed from 4 days to 9 days
-
updated by
Jens Ulferts on 02/21/2018 09:50 AM - Finish date changed from 02/23/2018 to 03/08/2018
- Duration changed from 33 days to 46 days
02/20/2018
-
updated by
Wieland Lindenthal on 02/20/2018 03:08 PM - Status changed from needs review to merged
- Assignee deleted (
Wieland Lindenthal)
-
updated by
Wieland Lindenthal on 02/20/2018 12:17 PM - Assignee changed from Henriette Darge to Wieland Lindenthal
-
updated by
Oliver Günther on 02/20/2018 11:51 AM - Start date changed from 01/15/2018 to 01/12/2018
- Duration changed from 106 days to 109 days
-
updated by
Oliver Günther on 02/20/2018 11:51 AM - Type set to Code maintenance
- Project set to OpenProject
- Subject set to Ensure replacement of wp-attachments-formattible exist
- Description set (Details)
- Status set to new
- Assignee set to Oliver Günther
- Priority set to Medium
- Version set to 8.0.0
- Author set to Oliver Günther
- % Complete set to 0%
- Start date set to 01/12/2018
- Parent set to WYSIWYG editor
- Scheduling mode set to Automatic
- Working days set to include non-working days
-
updated by
Oliver Günther on 02/20/2018 11:04 AM - Status changed from needs review to merged
-
updated by
Jens Ulferts on 02/20/2018 09:04 AM - Status changed from needs review to merged
- Assignee deleted (
Jens Ulferts)
-
updated by
Jens Ulferts on 02/20/2018 09:04 AM - Assignee deleted (
Jens Ulferts)
- Assignee deleted (
02/19/2018
-
updated by
Wieland Lindenthal on 02/19/2018 04:09 PM - Description set (Details)
-
updated by
Wieland Lindenthal on 02/19/2018 03:58 PM - Description set (Details)
- Assignee set to Wieland Lindenthal
-
updated by
Wieland Lindenthal on 02/19/2018 03:51 PM - Type set to Feature
- Project set to OpenProject
- Subject set to Wiki navigation across pages
- Status set to new
- Assignee set to Wieland Lindenthal
- Priority set to Medium
- Version set to 8.0.0
- Author set to Wieland Lindenthal
- % Complete set to 0%
- Parent set to Introduce second level to module navigation
- Scheduling mode set to Automatic
- Working days set to include non-working days
-
updated by
Wieland Lindenthal on 02/19/2018 03:50 PM - Type set to Feature
- Project set to OpenProject
- Subject set to Wiki navigation within page
- Status set to new
- Priority set to Medium
- Version set to 8.0.0
- Author set to Wieland Lindenthal
- % Complete set to 0%
- Parent set to Introduce second level to module navigation
- Scheduling mode set to Automatic
- Working days set to include non-working days
-
updated by
Wieland Lindenthal on 02/19/2018 03:48 PM - Finish date deleted (
02/25/2018) - Start date deleted (
02/05/2018) - Duration deleted (
21 days)
- Finish date deleted (
-
updated by
Wieland Lindenthal on 02/19/2018 03:35 PM - Subject changed from Wiki page navigation to Wiki navigation
- Description deleted (Details)
-
updated by
Wieland Lindenthal on 02/19/2018 02:51 PM - Status changed from new to in development
- Assignee changed from Henriette Darge to Wieland Lindenthal
02/16/2018
-
updated by
Henriette Darge on 02/16/2018 03:28 PM -
Comment added
PR: https://github.com/opf/openproject/pull/6182
- Status changed from confirmed to needs review
- Assignee set to Henriette Darge
-
Comment added
-
updated by
Robin Wagner on 02/16/2018 02:43 PM -
Comment added
Henriette and I talked about this:
Error can be avoided by either changing to “Letter” format or adjusting the scaling ...
- Status changed from in development to rejected
- Assignee deleted (
Henriette Darge) - Version deleted (
8.0.0)
-
Comment added
-
updated by
Henriette Darge on 02/16/2018 02:20 PM - Status changed from confirmed to in development
- Assignee set to Henriette Darge
-
updated by
Henriette Darge on 02/16/2018 02:05 PM -
Comment added
I started a second try and overwrote the `touchstart` event. Thus the project should now be selected on first click.
htt...
- Status changed from test failed to needs review
-
Comment added
-
updated by
Robin Wagner on 02/16/2018 09:32 AM - Assignee deleted (
Robin Wagner)
- Assignee deleted (
Also available in: Atom