01/20/2014
-
created by
Markus Kahl on 01/20/2014 06:19 PM -
updated by
Niels Lindenthal on 01/20/2014 05:00 PM - Assignee set to Philipp Tessenow
- Version deleted (
Wish List) - Accountable set to Philipp Tessenow
-
updated by
Jonas Heinrich (Finn) on 01/20/2014 04:53 PM -
Comment added
The missing homepage translation is also already solved.
- Description changed (Details)
-
Comment added
-
updated by
Jonas Heinrich (Finn) on 01/20/2014 04:48 PM -
Comment added
The first missing translation is already fixed (issue_by is now work_package_by).
- Description changed (Details)
-
Comment added
-
created by
Philipp Tessenow on 01/20/2014 04:46 PM -
created by
Ulrich Habel on 01/20/2014 04:22 PM -
updated by
Deleted user on 01/20/2014 03:33 PM - Description changed (Details)
-
updated by
Martin Czuchra on 01/20/2014 03:30 PM -
Comment added
Sorry for the loss of “Core Bug found in Version” and “Module”, it seems not to be available in User Stories, I didn’t d...
-
Comment added
-
updated by
Martin Czuchra on 01/20/2014 03:28 PM -
Comment added
I am not sure this is a bug, since we still need to decide on what the expected behaviour is. I am therefore turning thi...
- Type changed from Bug to Feature
- Assignee changed from Martin Czuchra to Deleted user
- Version deleted ()
- Bug found in version deleted (
(deleted option))
-
Comment added
-
created by
Deleted user on 01/20/2014 03:22 PM -
updated by
Alexander Bach on 01/20/2014 03:00 PM - Accountable changed from Jens Ulferts to Hagen Schink
-
updated by
Alexander Bach on 01/20/2014 02:47 PM - Parent set to Revise and stabilize API v2
-
updated by
Till Breuer on 01/20/2014 02:36 PM -
Comment added
https://github.com/opf/openproject/pull/822 plus related pull requests in my project and dark themes (see PR description...
- Status changed from in development to needs review
- Story Points changed from 1 to 8
-
Comment added
-
updated by
Alexander Bach on 01/20/2014 02:29 PM - Parent set to Revise and stabilize API v2
-
updated by
Jonas Heinrich (Finn) on 01/20/2014 02:00 PM -
Comment added
Hi Hagen,
could you please have a look at this one? I think it is a bug in the journaling of work packages.
Thanks,
Jona...
- Type set to Bug
- Project set to OpenProject
- Subject set to Strange additional journal entry when moving work package
- Description set (Details)
- Status set to new
- Assignee set to Hagen Schink
- Priority set to Medium
- Version deleted ()
- Author set to Jonas Heinrich (Finn)
- % Complete set to 0%
- Scheduling mode set to Automatic
- Working days set to include non-working days
- Bug found in version set to (deleted option)
-
Comment added
-
updated by
Hagen Schink on 01/20/2014 01:49 PM -
Comment added
This ticket is actually in progress in sprint 2014/1
- Status changed from on hold to in development
-
Comment added
-
updated by
Hagen Schink on 01/20/2014 10:51 AM - Description changed (Details)
- Status changed from specified to needs review
01/19/2014
-
created by
Jun Matsushita on 01/19/2014 06:13 PM
01/18/2014
-
updated by
Jun Matsushita on 01/18/2014 06:44 PM -
Comment added
+1
-
Comment added
-
updated by
Jun Matsushita on 01/18/2014 06:41 PM -
Comment added
Just realised this was also related to OP-1011
-
Comment added
-
updated by
Jun Matsushita on 01/18/2014 06:37 PM -
Comment added
Looks like some features (Move and Query Filters) already allow to select Groups as Responsible, although it breaks Work...
-
Comment added
-
created by
Jun Matsushita on 01/18/2014 06:36 PM
01/17/2014
-
created by
Johannes Wollert on 01/17/2014 04:37 PM -
created by
Johannes Wollert on 01/17/2014 04:36 PM -
updated by
Johannes Wollert on 01/17/2014 04:34 PM -
Comment added
I’ll split off smaller tickets as needed, because some of these issues are harder then others (especially custom field t...
-
Comment added
-
updated by
Hagen Schink on 01/17/2014 03:41 PM -
Comment added
Merged by Till
- Status changed from needs review to merged
-
Comment added
-
updated by
Johannes Wollert on 01/17/2014 03:13 PM - Status changed from needs review to in development
-
updated by
Jens Ulferts on 01/17/2014 02:18 PM - Finish date set to 02/14/2014
-
updated by
Jens Ulferts on 01/17/2014 02:18 PM -
Comment added
Updated automatically by changing values within child work package OP-913
- Finish date changed from 01/02/2014 to 02/14/2014
- Duration changed from 1 day to 44 days
-
Comment added
-
updated by
Jens Ulferts on 01/17/2014 02:17 PM - Start date set to 01/02/2014
-
updated by
Jens Ulferts on 01/17/2014 02:17 PM -
Comment added
Updated automatically by changing values within child work package OP-982
- Finish date set to 01/02/2014
- Start date set to 01/02/2014
- Duration set to 1 day
-
Comment added
-
updated by
Jens Ulferts on 01/17/2014 02:16 PM - Finish date set to 02/14/2014
- Start date set to 01/26/2014
- Duration set to 20 days
-
updated by
Jens Ulferts on 01/17/2014 02:16 PM -
Comment added
Updated automatically by changing values within child work package OP-1011
- Description changed (Details)
- Finish date set to 02/14/2014
- Start date set to 01/26/2014
- Duration set to 20 days
-
Comment added
-
updated by
Jens Ulferts on 01/17/2014 02:14 PM - Finish date set to 02/14/2014
- Start date set to 01/05/2014
- Duration set to 41 days
-
updated by
Hagen Schink on 01/17/2014 01:46 PM - Status changed from in development to needs review
-
updated by
Johannes Wollert on 01/17/2014 01:17 PM -
Comment added
After talking to Christian, I’m closing this, as there will be an overhaul of the whole view in #3600.
- Status changed from in development to closed
-
Comment added
-
updated by
Johannes Wollert on 01/17/2014 12:00 PM -
Comment added
As Christian hasn’t touched this yet, I’m claiming it.
- Status changed from confirmed to in development
- Assignee changed from Christian Ratz to Johannes Wollert
-
Comment added
-
updated by
Christian Ratz on 01/17/2014 11:51 AM - Status changed from new to confirmed
- Story Points changed from 0 to 1
-
updated by
Johannes Wollert on 01/17/2014 11:35 AM - Status changed from needs review to merged
-
updated by
Jens Ulferts on 01/17/2014 11:34 AM -
Comment added
We should wait for the design that is going to be created for OP-1017 before we begin the implementation.
- Status changed from specified to on hold
-
Comment added
-
updated by
Martin Czuchra on 01/17/2014 11:33 AM -
Comment added
I was convinced that the GitHub comment I made is not actually an issue. The PR was therefore reviewed, rebased and merg...
- Status changed from on hold to merged
-
Comment added
-
updated by
Jens Ulferts on 01/17/2014 11:31 AM -
Comment added
Thanks Robin, that works for me.
Birthe, can you please ask Christoph to provide a design.
- Status changed from needs review to in development
- Assignee changed from Jens Ulferts to Birthe Lindenthal
-
Comment added
-
updated by
Till Breuer on 01/17/2014 10:03 AM - Status changed from needs review to merged
-
updated by
Philipp Tessenow on 01/17/2014 10:03 AM -
Comment added
diskussed this wp with hagen and he seemed to understand :)
this is, in fact, a layout table. (it might be an attribute ...
- Status changed from on hold to specified
- Assignee changed from Philipp Tessenow to Hagen Schink
-
Comment added
-
updated by
Hagen Schink on 01/17/2014 09:44 AM - Status changed from needs review to merged
01/16/2014
-
updated by
Till Breuer on 01/16/2014 06:40 PM -
Comment added
Reviewed, comments the PR. Ready to merge though
-
Comment added
-
updated by
Till Breuer on 01/16/2014 06:11 PM - Status changed from needs review to merged
-
updated by
Niels Lindenthal on 01/16/2014 09:40 AM -
Comment added
+1
- Type set to Deliverable
-
Comment added
-
updated by
Hagen Schink on 01/16/2014 09:18 AM - Status changed from specified to in development
- Assignee set to Hagen Schink
-
updated by
Hagen Schink on 01/16/2014 09:18 AM -
Comment added
This issue is solved with the introduction of the new design.
- Status changed from specified to rejected
-
Comment added
-
updated by
Hagen Schink on 01/16/2014 09:18 AM -
Comment added
Updated automatically by changing values within child work package OP-629
- % Complete changed from 55% to 64%
-
Comment added
-
updated by
Hagen Schink on 01/16/2014 09:18 AM -
Comment added
Updated automatically by changing values within child work package OP-620
- % Complete changed from 59% to 62%
-
Comment added
-
updated by
Hagen Schink on 01/16/2014 08:30 AM - Status changed from needs review to merged
01/15/2014
-
updated by
Robin Wagner on 01/15/2014 07:16 PM -
Comment added
Hi Jens,
I updated the wireframe (in attached file):
I added the label “All” to select all attributes (based on user fe...
- Status changed from new to needs review
- Assignee changed from Robin Wagner to Jens Ulferts
- File Wireframe_-_Search_v.1.1.pptx added as attachment
-
Comment added
-
updated by
Robin Wagner on 01/15/2014 07:05 PM - File
Wireframe_-_Search.pptxremoved as attachment - File
Wireframe_-_Search.pdfremoved as attachment
- File
-
updated by
Till Breuer on 01/15/2014 05:45 PM -
Comment added
Extended PR with accessible toggle-links: https://github.com/opf/openproject/pull/822
-
Comment added
-
updated by
Hagen Schink on 01/15/2014 05:33 PM - Status changed from in development to needs review
-
created by
Robin Wagner on 01/15/2014 04:44 PM -
updated by
Hagen Schink on 01/15/2014 04:15 PM -
Comment added
OpenProject Costs PR 75
- Status changed from in development to needs review
-
Comment added
-
updated by
Johannes Wollert on 01/15/2014 03:02 PM - Status changed from needs review to merged
-
updated by
Johannes Wollert on 01/15/2014 02:33 PM -
Comment added
I just commented on some stuff in the PR. Might not be that big a deal, but it does determine how we go about switching ...
- Status changed from needs review to in development
-
Comment added
-
created by
Jens Ulferts on 01/15/2014 02:15 PM -
updated by
Robin Wagner on 01/15/2014 11:58 AM -
Comment added
Initial wireframes added (after discussion with Jens).
- File Wireframe_-_Search.pptx added as attachment
- File Wireframe_-_Search.pdf added as attachment
-
Comment added
-
updated by
Hagen Schink on 01/15/2014 11:29 AM - Status changed from specified to in development
- Assignee set to Hagen Schink
-
updated by
Hagen Schink on 01/15/2014 11:02 AM -
Comment added
OpenProject Reporting Engine PR 24
- Status changed from in development to needs review
-
Comment added
-
updated by
Till Breuer on 01/15/2014 10:10 AM -
Comment added
Updated automatically by changing values within child work package OP-970
- % Complete changed from 38% to 40%
-
Comment added
-
updated by
hans Hannes on 01/15/2014 08:52 AM - Type set to Activity
- Project set to OpenProject
- Subject set to Baudurchführung
- Description set (Details)
- Finish date set to 01/17/2014
- Status set to closed
- Assignee set to Alexander Bach
- Priority set to Medium
- Author set to hans Hannes
- % Complete set to 0%
- Work set to 12d 4h
- Start date set to 01/15/2014
- Scheduling mode set to Automatic
- Duration set to 3 days
- Working days set to include non-working days
-
updated by
Hagen Schink on 01/15/2014 08:15 AM - Assignee set to Hagen Schink
-
updated by
Hagen Schink on 01/15/2014 08:06 AM - Status changed from specified to in development
-
updated by
Hagen Schink on 01/15/2014 08:01 AM - Assignee deleted (
Till Breuer)
- Assignee deleted (
01/14/2014
-
updated by
Jens Ulferts on 01/14/2014 05:15 PM - Status changed from needs review to merged
-
updated by
Jens Ulferts on 01/14/2014 05:14 PM - Status changed from needs review to merged
-
updated by
Jens Ulferts on 01/14/2014 05:14 PM - Status changed from needs review to merged
-
updated by
Till Breuer on 01/14/2014 04:59 PM -
Comment added
PR: https://github.com/opf/openproject/pull/820
- Status changed from in development to needs review
-
Comment added
-
updated by
Hagen Schink on 01/14/2014 04:57 PM -
Comment added
PR 819
- Status changed from in development to needs review
-
Comment added
-
created by
Jonas Heinrich (Finn) on 01/14/2014 03:39 PM -
updated by
Till Breuer on 01/14/2014 03:13 PM - Status changed from specified to in development
- Assignee set to Till Breuer
-
updated by
Till Breuer on 01/14/2014 03:08 PM -
Comment added
<a class=“icon icon-close close-icon” href=“#” title=“Infobox löschen” …>
- Description changed (Details)
- Status changed from specified to rejected
-
Comment added
-
updated by
Till Breuer on 01/14/2014 03:08 PM -
Comment added
Updated automatically by changing values within child work package OP-632
- % Complete changed from 45% to 55%
-
Comment added
-
updated by
Till Breuer on 01/14/2014 03:08 PM -
Comment added
Updated automatically by changing values within child work package OP-620
- % Complete changed from 57% to 59%
-
Comment added
-
updated by
Till Breuer on 01/14/2014 03:02 PM -
Comment added
None of the above observations can be reproduced on current dev-branch
- Status changed from specified to rejected
-
Comment added
-
updated by
Till Breuer on 01/14/2014 03:02 PM -
Comment added
Updated automatically by changing values within child work package OP-637
- % Complete changed from 36% to 45%
-
Comment added
-
updated by
Till Breuer on 01/14/2014 03:02 PM -
Comment added
Updated automatically by changing values within child work package OP-620
- % Complete changed from 55% to 57%
-
Comment added
-
updated by
Till Breuer on 01/14/2014 02:55 PM -
Comment added
The “alt”-Texts are translated. On the contrary the ‘No file selected’ isn’t.
- Status changed from specified to rejected
-
Comment added
-
updated by
Till Breuer on 01/14/2014 02:55 PM -
Comment added
Updated automatically by changing values within child work package OP-638
- % Complete changed from 27% to 36%
-
Comment added
-
updated by
Till Breuer on 01/14/2014 02:55 PM -
Comment added
Updated automatically by changing values within child work package OP-620
- % Complete changed from 53% to 55%
-
Comment added
-
updated by
Till Breuer on 01/14/2014 02:50 PM -
Comment added
149fe108 (Christian Ratz 2013-12-02 14:19:24 +0100 73) <%= link_to_if_authorized icon_wrapper(‘icon-context icon-dele...
- Status changed from specified to rejected
-
Comment added
-
updated by
Till Breuer on 01/14/2014 02:50 PM -
Comment added
Updated automatically by changing values within child work package OP-640
- % Complete changed from 18% to 27%
-
Comment added
-
updated by
Till Breuer on 01/14/2014 02:50 PM -
Comment added
Updated automatically by changing values within child work package OP-620
- % Complete changed from 51% to 53%
-
Comment added
-
updated by
Till Breuer on 01/14/2014 02:44 PM -
Comment added
There are already <span class“hidden-for-sighted”> Tags with explanations + German translations.
- Status changed from in development to rejected
-
Comment added
-
updated by
Till Breuer on 01/14/2014 02:44 PM -
Comment added
Updated automatically by changing values within child work package OP-641
- % Complete changed from 9% to 18%
-
Comment added
-
updated by
Till Breuer on 01/14/2014 02:44 PM -
Comment added
Updated automatically by changing values within child work package OP-620
- % Complete changed from 48% to 51%
-
Comment added
-
updated by
Till Breuer on 01/14/2014 02:34 PM - Status changed from specified to in development
- Assignee set to Till Breuer
-
updated by
Niels Lindenthal on 01/14/2014 02:31 PM - Status changed from specified to in development
- Assignee set to Hagen Schink
- Accountable set to Hagen Schink
-
updated by
Niels Lindenthal on 01/14/2014 02:30 PM - Status changed from specified to in development
- Assignee set to Hagen Schink
- Accountable set to Hagen Schink
-
updated by
Niels Lindenthal on 01/14/2014 02:30 PM - Status changed from specified to in development
- Assignee set to Hagen Schink
- Accountable set to Hagen Schink
-
updated by
Niels Lindenthal on 01/14/2014 02:29 PM - Status changed from specified to in development
- Assignee set to Hagen Schink
- Accountable set to Hagen Schink
-
updated by
Niels Lindenthal on 01/14/2014 02:28 PM - Status changed from specified to in development
- Assignee set to Hagen Schink
- Accountable set to Hagen Schink
-
updated by
Niels Lindenthal on 01/14/2014 02:28 PM - Status changed from specified to in development
-
updated by
Niels Lindenthal on 01/14/2014 02:28 PM - Status changed from specified to in development
- Assignee set to Hagen Schink
- Accountable set to Hagen Schink
-
updated by
Till Breuer on 01/14/2014 02:26 PM -
Comment added
Hagen, is the PR related to this ticket or rather to #2260?
-
Comment added
-
updated by
Hagen Schink on 01/14/2014 02:16 PM - Status changed from specified to in development
- Assignee set to Hagen Schink
-
updated by
Hagen Schink on 01/14/2014 02:15 PM - Status changed from needs review to merged
-
updated by
Till Breuer on 01/14/2014 02:12 PM -
Comment added
Philipp Tessenow wrote:
I assume this is not assigned to me anymore :)
But then it’s assigned to me? ;)
-
Comment added
-
updated by
Jens Ulferts on 01/14/2014 01:40 PM -
Comment added
Updated automatically by changing values within child work package #3788
- % Complete changed from 70% to 67%
-
Comment added
-
updated by
Jens Ulferts on 01/14/2014 01:40 PM -
Comment added
Updated automatically by changing values within child work package OP-589
- % Complete changed from 50% to 48%
-
Comment added
-
updated by
Jens Ulferts on 01/14/2014 01:37 PM -
Comment added
Updated automatically by changing values within child work package #3787
- % Complete changed from 74% to 70%
-
Comment added
-
updated by
Jens Ulferts on 01/14/2014 01:37 PM -
Comment added
Updated automatically by changing values within child work package OP-589
- % Complete changed from 51% to 50%
-
Comment added
-
updated by
Hagen Schink on 01/14/2014 12:40 PM -
Comment added
PR 818
-
Comment added
-
updated by
Hagen Schink on 01/14/2014 12:39 PM -
Comment added
Hi Philipp,
according to my understanding the work package details table is actually not just a layout table but summari...
- Status changed from in development to on hold
- Assignee changed from Hagen Schink to Philipp Tessenow
-
Comment added
-
updated by
Martin Czuchra on 01/14/2014 12:14 PM - Status changed from needs review to on hold
-
updated by
Niels Lindenthal on 01/14/2014 11:18 AM -
Comment added
Hi Robin,
please align with Jens in order to prepare wireframes.
Thanks
Niels
- Assignee set to Robin Wagner
- Version deleted (
Product Backlog) - Accountable set to Jens Ulferts
-
Comment added
-
updated by
Niels Lindenthal on 01/14/2014 11:15 AM - Assignee set to Jens Ulferts
- Version deleted (
Product Backlog) - Accountable set to Jens Ulferts
-
updated by
Niels Lindenthal on 01/14/2014 11:14 AM - Status changed from new to in development
-
updated by
Niels Lindenthal on 01/14/2014 11:14 AM - Assignee set to Jens Ulferts
- Version deleted (
Product Backlog) - Accountable set to Jens Ulferts
-
updated by
Jonas Heinrich (Finn) on 01/14/2014 11:12 AM -
Comment added
This unclear behavior also applies to the deleting of an hourly rate. Maybe one needs to have a look at all those deleti...
-
Comment added
-
updated by
Niels Lindenthal on 01/14/2014 11:11 AM - Assignee set to Jens Ulferts
- Version deleted (
Product Backlog) - Accountable set to Jens Ulferts
-
updated by
Niels Lindenthal on 01/14/2014 11:11 AM - Assignee set to Jens Ulferts
- Version deleted (
Product Backlog) - Accountable set to Jens Ulferts
-
updated by
Niels Lindenthal on 01/14/2014 11:10 AM - Assignee set to Jens Ulferts
- Version deleted (
Product Backlog) - Accountable set to Jens Ulferts
-
updated by
Niels Lindenthal on 01/14/2014 11:09 AM - Assignee set to Jens Ulferts
- Version deleted ()
- Accountable set to Jens Ulferts
-
updated by
Niels Lindenthal on 01/14/2014 11:05 AM - Status changed from specified to in development
- Version deleted ()
-
updated by
Niels Lindenthal on 01/14/2014 10:59 AM - Version deleted ()
- Accountable set to Jens Ulferts
-
updated by
Jonas Heinrich (Finn) on 01/14/2014 10:47 AM - Description changed (Details)
-
updated by
Hagen Schink on 01/14/2014 10:34 AM - Status changed from specified to in development
- Assignee set to Hagen Schink
-
updated by
Till Breuer on 01/14/2014 10:06 AM - Status changed from needs review to merged
-
updated by
Till Breuer on 01/14/2014 10:02 AM -
Comment added
There are already “title”-attributes read by screen readers.
- Status changed from in development to rejected
-
Comment added
-
updated by
Till Breuer on 01/14/2014 10:02 AM -
Comment added
Updated automatically by changing values within child work package OP-642
- % Complete changed from 0% to 9%
-
Comment added
-
updated by
Till Breuer on 01/14/2014 10:02 AM -
Comment added
Updated automatically by changing values within child work package OP-620
- % Complete changed from 48% to 51%
-
Comment added
-
updated by
Till Breuer on 01/14/2014 09:55 AM - Status changed from needs review to merged
-
updated by
Hagen Schink on 01/14/2014 09:14 AM - Status changed from in development to needs review
-
updated by
Till Breuer on 01/14/2014 09:07 AM - Status changed from specified to in development
- Assignee set to Till Breuer
-
updated by
Hagen Schink on 01/14/2014 08:39 AM - Status changed from needs review to in development
-
updated by
Hagen Schink on 01/14/2014 08:39 AM -
Comment added
PR 816
- Subject changed from [Accessibility] correctly label document language to [Accessibility] correctly label document language of menu items
- Status changed from in development to needs review
-
Comment added
-
created by
hong james on 01/14/2014 08:23 AM