Content
View differences
Updated by Parimal Satyal over 1 year ago
#### Context
These scenarios concerning single date mode complement and add to these existing scenarios:
* ###61054
* ###60670
These scenarios will test changes to the date picker introduced by:
* ###47519
This document will not duplicate scenarios already included in the above. This means that the following scenarios:
* are not affected by the 'Working days only' switch; it will assumed to always be enabled. Saturdays and Sundays considered non-working days
* do not include specific scenarios related to manual/automatic scheduling and the adding/reming of predecessor/successor or children; in effect, it is already possible to use 'single date mode' today by simply removing either of Start or Finish dates of work packages. The current behaviour will be maintained.
* _\[open\] Or do we need scenarios for these too?_
### Work in progress
**Please note that these scenarios are still a work in progress. Do not use them until the status is changed to 'Scheduled'.**
### Basic
#### **Scenario 1: Adding a Finish date to a new work package 🟢**
* Setup
* Start date: (inactive: + Start date button)
* Finish date: empty
* Duration: empty
* Focus is on Finish date
* Date picker is in single mode
* Change
* Click on Fri, 14 Feb, 2025
* Expected result:
* Start date: (inactive: + Start date button)
* Finish date: Fri, 14 Feb, 2025
* Duration: empty
* Focus remains on Finish date
* Date picker remains in single date mode (Finish date only)
<br>
#### **Scenario 2: Adding a Start date to a new work package 🟢**
* Setup
* Start date: (inactive: + Start date button)
* Finish date: empty
* Duration: empty
* Focus is on Finish date
* Date picker is in single mode
* Change
* Click + Start date to active field and move focus to Start date
* Click on Wed, 12 Feb, 2025
* Expected result:
* Start date: Wed, 12 Feb, 2024
* Finish date: empty
* Duration: empty
* Focus switches to Finish date after selection of start date
* Date picker goes to range mode (until 'Save' is hit)
<br>
#### **Scenario 3a: Modifying a single date: new date in the past 🟢**
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus is on Start date
* Date picker is in single mode
* Change
* Click on Mon, 3 Feb, 2024 (this must be in the past relative to current date)
* Expected result:
* Start date: Mon, 3 Feb, 2024
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus remains on Start date
* Date picker remains in single date mode (Start date only)
<br>
#### **Scenario 3b:** Also run the above test but with Finish date 🟢
<br>
#### **Scenario 4a: Modifying a single date: new date in the future 🟢**
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus is on Start date
* Date picker is in single mode
* Change
* Click on Wed, 26 Feb, 2024 (this must be in the future relative to current date)
* Expected result:
* Start date: Wed, 26 Feb, 2024
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus is on Start date
* Date picker remains in single date mode (Start date only)
<br>
#### **Scenario 4b: Also run** the above test but with Finish date 🟢
<br>
#### **Scenario 5: Single date mode (Finish date only), Clear finish date 🟢**
* Setup
* Start date: (inactive: + Start date button)
* Finish date: Fri, 14 Feb, 2025
* Duration: empty
* Focus is on Finish date
* Date picker is in single mode
* Change
* Click on the clear action (X) on the Finish date
* Expected result:
* Start date: (inactive: + Start date button)
* Finish date: empty
* Duration: empty
* Focus remains on Finish date
* Date picker remains in single date mode (Finish date only)
<br>
#### **Scenario 6: Single date mode (Start date only), Clear start date 🟢**
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus is on Finish date
* Date picker is in single mode
* Change
* Click on the clear action (X) on the Start date
* Expected result:
* Start date: empty
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus remains on Start date
* Date picker remains in single date mode (Start date only, until 'Save' is hit)
<br>
### Switching and mixed mode
#### **Scenario 7: In finish date mode, add start date 🟢**
* Setup
* Start date: (inactive: + Start date button)
* Finish date: Fri, 14 Feb, 2025
* Duration: empty
* Focus is on Finish date
* Date picker is in single mode
* Change
* Click on the + Start date button
* Focus is set to Start date
* Click on Wed, 12 Feb, 2025
* Expected result:
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3
* Focus is on Finish date
* Date picker goes to range mode
<br>
#### **Scenario 8: In finish date mode, add duration 🟢** 🔵**
* Setup
* Start date: (inactive: + Start date button)
* Finish date: Fri, 14 Feb, 2025
* Duration: empty
* Focus is on Finish date
* Date picker is in single mode
* Change
* Set focus to Duration and enter 3
* Expected result:
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3 days
* Focus remains on Duration
* _\[open\] If the user does not tab or click on another field, focus does not change, right?_
* 🟡 yes, focus is still on the duration field. If they want to enter "30" and are a bit long to type the "0", that's better. If the user then clicks another date in the calendar, like Tue 4, then it would update the start date. This is the current behavior (not illustrated in our scenarios in #60670)
* Date picker goes to range mode
<br>
#### **Scenario 9: In finish date mode, clear date and add only duration 🟢**
* Setup
* Start date: (inactive: + Start date button)
* Finish date: Fri, 14 Feb, 2025
* Duration: empty
* Focus is on Finish date
* Date picker is in single mode
* Change
* Click on the clear action (X) on the Finish date
* Set focus to Duration and enter 3
* Expected result:
* Start date: (inactive: + Start date button)
* Finish date: empty
* Duration: 3 days
* Focus remains on Duration
* Date picker remains in single date mode (until 'Save' is hit)
<br>
#### **Scenario 10: In start date mode, add finish date 🟢**
* Setup:
* Start date: Wed, 12 Feb, 2025
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus is on Start date
* Date picker is in single mode
* Change
* Click on the + Finish date button to set focus to Finish date
* Click on Fri, 14 Feb, 2025
* Expected result:
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3
* Focus switches to Start date after input of Finish date
* Date picker goes to range mode
<br>
#### **Scenario 11: In start date mode, add duration 🟢** 🔵**
* Setup:
* Start date: Wed, 12 Feb, 2025
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus is on Start date
* Date picker is in single mode
* Change
* Set focus to duration, enter 3
* Expected result:
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3
* Focus remains on Duration
* _\[open\] If the user does not tab or click on another field, focus does not change, right?_
* 🟡 yes focus is still on duration field
* Date picker goes to range mode
<br>
#### **Scenario 12: In start date mode, clear date and add only duration 🟢** 🔵**
* Setup:
* Start date: Wed, 12 Feb, 2025
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus is on Start date
* Date picker is in single mode
* Change
* Click on the clear action (X) on the Start date
* Set focus to Duration and enter 3
* Expected result:
* Start date: empty
* Finish date: (inactive: + Finish date button)
* Duration: 3
* Focus remains on Duration
* _\[open\] If the user does not tab or click on another field, focus does not change, right?_
* 🟡 yes focus is still on duration field
* Date picker remains in single date mode
<br>
#### **Scenario 13: In range mode, remove finish date 🟢**
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3
* Change
* Click on the clear action (X) on the Finish date
* Expected result:
* Start date: Wed, 12 Feb, 2025
* Finish date: empty
* Duration: empty
* Focus remains on Finish date
* Date picker remains in range mode (until 'Save' is clicked on)
<br>
#### **Scenario 14: In range mode, remove start date 🟢**
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3
* Change
* Click on the clear action (X) on the Start date
* Expected result:
* Start date: empty
* Finish date: Fri, 14 Feb, 2025
* Duration: empty
* Focus remains on Start date
* Date picker remains in range date mode (until 'Save' is clicked on)
<br>
#### **Scenario 15: In range mode, remove duration 🟢**
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3
* Change
* Focus on Duration and remove the value
* Expected result:
* Start date: Wed, 12 Feb, 2025
* Finish date: empty
* Duration: empty
* Focus remains on Duration
* Date picker remains in range date mode (until 'Save' is clicked on)
<br>
### Save and open
#### Scenario 16: In single mode (Finish only), remove finish date, save and open 🟢
* Setup
* Start date: (inactive: + Start date button)
* Finish date: Fri, 14 Feb, 2025
* Duration: empty
* Focus is on Finish date
* Change
* Click on the clear action (X) on the Finish date
* Click Save and open date picker again
* Expected result:
* Start date: (inactive: + Start date button)
* Finish date: empty
* Duration: empty
* Focus is on Finish date
* Date picker is in single mode
<br>
#### **Scenario 17: In single mode (Start only), remove start date, save and open 🟢**
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus is on Finish date
* Change
* Click on the clear action (X) on the Start date
* Click Save and open date picker again
* Expected result:
* Start date: (inactive: + Start date button)
* Finish date: empty
* Duration: empty
* Focus is on Finish date
* Date picker is in single date mode (Finish date)
<br>
#### Scenario 18: In range mode, remove duration, save and open 🟢 🔵
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3
* Change
* Focus on Duration and remove the value
* Click Save and open date picker again
* Expected result:
* Start date: Wed, 12 Feb, 2025
* _\[open\] Here, I envisage the finish date being removed when duration is removed in a range. Thoughts?_
* 🟡 yes, fine for me. That's consistent with the current behavior.
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus is on Start date
* Date picker is in single date mode
<br>
#### Scenario 19: In range mode, remove start date, save and open 🟢
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3
* Change
* Click on the clear action (X) on the Start date
* Click Save and open date picker again
* Expected result:
* Start date: (inactive: + Start date button)
* Finish date: Fri, 14 Feb, 2025
* Duration: empty
* Focus on Finish date
* Date picker is in single date mode
<br>
#### Scenario 20: In range mode, remove finish date, save and open 🟢
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3
* Change
* Click on the clear action (X) on the Finish date
* Click Save and open date picker again
* Expected result:
* Start date: Wed, 12 Feb, 2025
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus is on Start date
* Date picker is in single date mode
<br>
#### Scenario 21a: In range mode, clear all dates, save and open 🟢
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3
* Change
* Click on the clear action (X) on the Finish date (to clear Finish date and duration)
* Click on the clear action (X) on the Start date
* Click Save and open date picker again
* Expected result:
* Start date: (inactive: + Start date button)
* Finish date: empty
* Duration: empty
* Focus on Finish date
* Date picker is in single date mode
<br>
#### Scenario 21b: To do the same thing but clear Start date and then Finish date 🟢
<br>
#### Scenario 22: In range mode, clear all dates, change duration, save and open 🟢
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3
* Change
* Click on the clear action (X) on the Finish date (to clear Finish date and duration)
* Click on the clear action (X) on the Start date
* Focus on Duration and type 5
* Click Save and open date picker again
* Expected result:
* Start date: (inactive: + Start date button)
* Finish date: empty
* Duration: 5
* Focus on Finish date
* Date picker is in single date mode
<br>
#### Scenario 22b: To do the same thing but clear Start date and then Finish date 🟢
<br>
<br>
These scenarios concerning single date mode complement and add to these existing scenarios:
* ###61054
* ###60670
These scenarios will test changes to the date picker introduced by:
* ###47519
This document will not duplicate scenarios already included in the above. This means that the following scenarios:
* are not affected by the 'Working days only' switch; it will assumed to always be enabled. Saturdays and Sundays considered non-working days
* do not include specific scenarios related to manual/automatic scheduling and the adding/reming of predecessor/successor or children; in effect, it is already possible to use 'single date mode' today by simply removing either of Start or Finish dates of work packages. The current behaviour will be maintained.
* _\[open\] Or do we need scenarios for these too?_
**Please note that these scenarios are still a work in progress. Do not use them until the status is changed to 'Scheduled'.**
###
#### **Scenario 1: Adding a Finish date to a new work package 🟢**
* Setup
* Start date: (inactive: + Start date button)
* Finish date: empty
* Duration: empty
* Focus is on Finish date
* Date picker is in single mode
* Change
* Click on Fri, 14 Feb, 2025
* Expected result:
* Start date: (inactive: + Start date button)
* Finish date: Fri, 14 Feb, 2025
* Duration: empty
* Focus remains on Finish date
* Date picker remains in single date mode (Finish date only)
<br>
#### **Scenario 2: Adding a Start date to a new work package 🟢**
* Setup
* Start date: (inactive: + Start date button)
* Finish date: empty
* Duration: empty
* Focus is on Finish date
* Date picker is in single mode
* Change
* Click + Start date to active field and move focus to Start date
* Click on Wed, 12 Feb, 2025
* Expected result:
* Start date: Wed, 12 Feb, 2024
* Finish date: empty
* Duration: empty
* Focus switches to Finish date after selection of start date
* Date picker goes to range mode (until 'Save' is hit)
<br>
#### **Scenario 3a: Modifying a single date: new date in the past 🟢**
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus is on Start date
* Date picker is in single mode
* Change
* Click on Mon, 3 Feb, 2024 (this must be in the past relative to current date)
* Expected result:
* Start date: Mon, 3 Feb, 2024
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus remains on Start date
* Date picker remains in single date mode (Start date only)
<br>
#### **Scenario 3b:** Also run the above test but with Finish date 🟢
<br>
#### **Scenario 4a: Modifying a single date: new date in the future 🟢**
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus is on Start date
* Date picker is in single mode
* Change
* Click on Wed, 26 Feb, 2024 (this must be in the future relative to current date)
* Expected result:
* Start date: Wed, 26 Feb, 2024
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus is on Start date
* Date picker remains in single date mode (Start date only)
<br>
#### **Scenario 4b: Also run** the above test but with Finish date 🟢
<br>
#### **Scenario 5: Single date mode (Finish date only), Clear finish date 🟢**
* Setup
* Start date: (inactive: + Start date button)
* Finish date: Fri, 14 Feb, 2025
* Duration: empty
* Focus is on Finish date
* Date picker is in single mode
* Change
* Click on the clear action (X) on the Finish date
* Expected result:
* Start date: (inactive: + Start date button)
* Finish date: empty
* Duration: empty
* Focus remains on Finish date
* Date picker remains in single date mode (Finish date only)
<br>
#### **Scenario 6: Single date mode (Start date only), Clear start date 🟢**
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus is on Finish date
* Date picker is in single mode
* Change
* Click on the clear action (X) on the Start date
* Expected result:
* Start date: empty
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus remains on Start date
* Date picker remains in single date mode (Start date only, until 'Save' is hit)
<br>
### Switching and mixed mode
#### **Scenario 7: In finish date mode, add start date 🟢**
* Setup
* Start date: (inactive: + Start date button)
* Finish date: Fri, 14 Feb, 2025
* Duration: empty
* Focus is on Finish date
* Date picker is in single mode
* Change
* Click on the + Start date button
* Focus is set to Start date
* Click on Wed, 12 Feb, 2025
* Expected result:
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3
* Focus is on Finish date
* Date picker goes to range mode
<br>
#### **Scenario 8: In finish date mode, add duration 🟢**
* Setup
* Start date: (inactive: + Start date button)
* Finish date: Fri, 14 Feb, 2025
* Duration: empty
* Focus is on Finish date
* Date picker is in single mode
* Change
* Set focus to Duration and enter 3
* Expected result:
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3 days
* Focus remains on Duration
* 🟡 yes, focus is still on the duration field. If they want to enter "30" and are a bit long to type the "0", that's better. If the user then clicks another date in the calendar, like Tue 4, then it would update the start date. This is the current behavior (not illustrated in our scenarios in #60670)
*
<br>
#### **Scenario 9: In finish date mode, clear date and add only duration 🟢**
* Setup
* Start date: (inactive: + Start date button)
* Finish date: Fri, 14 Feb, 2025
* Duration: empty
* Focus is on Finish date
* Date picker is in single mode
* Change
* Click on the clear action (X) on the Finish date
* Set focus to Duration and enter 3
* Expected result:
* Start date: (inactive: + Start date button)
* Finish date: empty
* Duration: 3 days
* Focus remains on Duration
* Date picker remains in single date mode (until 'Save' is hit)
<br>
#### **Scenario 10: In start date mode, add finish date 🟢**
* Setup:
* Start date: Wed, 12 Feb, 2025
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus is on Start date
* Date picker is in single mode
* Change
* Click on the + Finish date button to set focus to Finish date
* Click on Fri, 14 Feb, 2025
* Expected result:
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3
* Focus switches to Start date after input of Finish date
* Date picker goes to range mode
<br>
#### **Scenario 11: In start date mode, add duration 🟢**
* Setup:
* Start date: Wed, 12 Feb, 2025
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus is on Start date
* Date picker is in single mode
* Change
* Set focus to duration, enter 3
* Expected result:
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3
* Focus remains on Duration
* 🟡 yes focus is still on duration field
*
<br>
#### **Scenario 12: In start date mode, clear date and add only duration 🟢**
* Setup:
* Start date: Wed, 12 Feb, 2025
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus is on Start date
* Date picker is in single mode
* Change
* Click on the clear action (X) on the Start date
* Set focus to Duration and enter 3
* Expected result:
* Start date: empty
* Finish date: (inactive: + Finish date button)
* Duration: 3
* Focus remains on Duration
* 🟡 yes focus is still on duration field
*
<br>
#### **Scenario 13: In range mode, remove finish date 🟢**
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3
* Change
* Click on the clear action (X) on the Finish date
* Expected result:
* Start date: Wed, 12 Feb, 2025
* Finish date: empty
* Duration: empty
* Focus remains on Finish date
* Date picker remains in range mode (until 'Save' is clicked on)
<br>
#### **Scenario 14: In range mode, remove start date 🟢**
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3
* Change
* Click on the clear action (X) on the Start date
* Expected result:
* Start date: empty
* Finish date: Fri, 14 Feb, 2025
* Duration: empty
* Focus remains on Start date
* Date picker remains in range date mode (until 'Save' is clicked on)
<br>
#### **Scenario 15: In range mode, remove duration 🟢**
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3
* Change
* Focus on Duration and remove the value
* Expected result:
* Start date: Wed, 12 Feb, 2025
* Finish date: empty
* Duration: empty
* Focus remains on Duration
* Date picker remains in range date mode (until 'Save' is clicked on)
<br>
### Save and open
#### Scenario 16: In single mode (Finish only), remove finish date, save and open 🟢
* Setup
* Start date: (inactive: + Start date button)
* Finish date: Fri, 14 Feb, 2025
* Duration: empty
* Focus is on Finish date
* Change
* Click on the clear action (X) on the Finish date
* Click Save and open date picker again
* Expected result:
* Start date: (inactive: + Start date button)
* Finish date: empty
* Duration: empty
* Focus is on Finish date
* Date picker is in single mode
<br>
#### **Scenario 17: In single mode (Start only), remove start date, save and open 🟢**
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus is on Finish date
* Change
* Click on the clear action (X) on the Start date
* Click Save and open date picker again
* Expected result:
* Start date: (inactive: + Start date button)
* Finish date: empty
* Duration: empty
* Focus is on Finish date
* Date picker is in single date mode (Finish date)
<br>
#### Scenario 18: In range mode, remove duration, save and open 🟢
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3
* Change
* Focus on Duration and remove the value
* Click Save and open date picker again
* Expected result:
* Start date: Wed, 12 Feb, 2025
* _\[open\] Here, I envisage the finish date being removed when duration is removed in a range. Thoughts?_
* 🟡 yes, fine for me. That's consistent with the current behavior.
* Duration: empty
* Focus is on Start date
* Date picker is in single date mode
<br>
#### Scenario 19: In range mode, remove start date, save and open 🟢
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3
* Change
* Click on the clear action (X) on the Start date
* Click Save and open date picker again
* Expected result:
* Start date: (inactive: + Start date button)
* Finish date: Fri, 14 Feb, 2025
* Duration: empty
* Focus on Finish date
* Date picker is in single date mode
<br>
#### Scenario 20: In range mode, remove finish date, save and open 🟢
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3
* Change
* Click on the clear action (X) on the Finish date
* Click Save and open date picker again
* Expected result:
* Start date: Wed, 12 Feb, 2025
* Finish date: (inactive: + Finish date button)
* Duration: empty
* Focus is on Start date
* Date picker is in single date mode
<br>
#### Scenario 21a: In range mode, clear all dates, save and open 🟢
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3
* Change
* Click on the clear action (X) on the Finish date (to clear Finish date and duration)
* Click on the clear action (X) on the Start date
* Click Save and open date picker again
* Expected result:
* Start date: (inactive: + Start date button)
* Finish date: empty
* Duration: empty
* Focus on Finish date
* Date picker is in single date mode
<br>
#### Scenario 21b: To do the same thing but clear Start date and then Finish date 🟢
<br>
#### Scenario 22: In range mode, clear all dates, change duration, save and open 🟢
* Setup
* Start date: Wed, 12 Feb, 2025
* Finish date: Fri, 14 Feb, 2025
* Duration: 3
* Change
* Click on the clear action (X) on the Finish date (to clear Finish date and duration)
* Click on the clear action (X) on the Start date
* Focus on Duration and type 5
* Click Save and open date picker again
* Expected result:
* Start date: (inactive: + Start date button)
* Finish date: empty
* Duration: 5
* Focus on Finish date
* Date picker is in single date mode
<br>
#### Scenario 22b: To do the same thing but clear Start date and then Finish date 🟢
<br>
<br>