**As a** project manager
**I want to** understand the relations constraints when setting dates or switching scheduling mode
**So that** I feel This is part of ##42388, split in control and avoid switching smaller chunks to Gantt view to understand relations. deliver values more often.
#### Acceptance criteria
##### **Date picker: Predecessor, Successor and Children tabs**
* There This chunk is now an _UnderlineNav_ bar at about adding the top:
* With three options:
* Dates
* Predecessors
* Successors
* Children
* Each of the relations tabs displays to the number of relations of that type with a badge
* In each tab, all relations of that type are displayed in a box list
* The content is the same as in the "Relations" tab of the work package, but without the section header
* In the "Predecessors" tab, when there are multiple predecessors, the one setting the date of the current work package has a label picker.
Before that says "Closest" next to the date and lag picker does not display information
* When two predecessors or more have the same end date, by convention the oldest one is chosen as the closest (_created\_at_ field).
* If there are no predecessors about predecessors, successors, and automatic scheduling mode children relations.
This is selected described in greater details in the date picker:
* a blankslate with a primary action to add a predecessor will parent work package.
It can be displayed (permissions allowing)
#### Visuals
_**Note:** Please check_ [_Figma_](https://www.figma.com/design/HrWVktq0SsGI2dqqIKQ11M/Scheduling---Lag-and-Modes?node-id=175-3641) _for the most recent mockups._
**Date picker Predecessors tab:**
<img class="image_resized op-uc-image op-uc-image_inline" style="width:540px;" src="/api/v3/attachments/226781/content"> started only once ##59539 is completed.
**I want to** understand the relations constraints when setting dates or switching scheduling mode
**So that** I feel
#### Acceptance criteria
##### **Date picker: Predecessor, Successor and Children tabs**
* There
* With three options:
* Dates
* Predecessors
* Successors
* Children
* Each of the
* In each tab, all relations of that type are displayed in a box list
* The content is the same as in the "Relations" tab of the work package, but without the section header
* In the "Predecessors" tab, when there are multiple predecessors, the one setting the date of the current work package has a label
Before
* When two predecessors or more have the same end date, by convention the oldest one is chosen as the closest (_created\_at_ field).
* If there are no predecessors
This
* a blankslate with a primary action to add a predecessor will
It can
#### Visuals
_**Note:** Please check_ [_Figma_](https://www.figma.com/design/HrWVktq0SsGI2dqqIKQ11M/Scheduling---Lag-and-Modes?node-id=175-3641) _for the most recent mockups._
**Date picker Predecessors tab:**
<img class="image_resized op-uc-image op-uc-image_inline" style="width:540px;" src="/api/v3/attachments/226781/content">