**As a** project manager
**I want to** add scheduling constraints
**So that** I better control the scheduling in my project.
**Acceptance criteria**
* A work package can have to different scheduling modes:
* Manually scheduled (default)
* Automatically scheduled
* If In the user selects _Automatically scheduled_ the user can select between date picker there are two scheduling constraints:
1. As early as possible (default)
2. Not earlier than
* When the scheduling constraint _Not earlier than_ is activated there is a date picker that allows to select the `Constraint date`.
<figure class="image op-uc-figure"><div class="op-uc-figure--content"><img class="op-uc-image" src="/api/v3/attachments/113671/content"></div><figcaption class="op-uc-figure--description">Default constraint type: As soon as possible</figcaption></figure>
* In Gantt view: When moving a automatically scheduled work package forward the constraint is changed from `_as early as possible_` to `_not earlier than_`_._ The constraint date is set to the new start date of the moved work package.
<figure class="image op-uc-figure"><div class="op-uc-figure--content"><img class="op-uc-image" src="/api/v3/attachments/113673/content"></div><figcaption class="op-uc-figure--description">Constraint Type: Start no earlier than</figcaption></figure>
* There is a date picker that allows to select the `Constraint date` for `not earlier than`.
* When changing the the constraint type from _Not earlier than_ `Constraint type` to _As as soon as possible_ possible the _constraint date_ the `Constraint date` is deleted.
* In the work packages module and the Gantt module there There are two new work package columns:
* `Constraint type`
* `Constraint date`
**Acceptance criteria**
* A work package can have to different scheduling modes:
* Manually scheduled (default)
* Automatically scheduled
* If
1. As early as possible (default)
2. Not earlier than
* When the scheduling constraint _Not earlier than_ is activated there is a date picker that allows to select the `Constraint date`.
* In Gantt view: When moving a automatically scheduled work package forward the constraint is changed from `_as early as possible_` to `_not earlier than_`_._ The constraint date is set to the new start date of the moved work package.
<figure class="image op-uc-figure"><div class="op-uc-figure--content"><img class="op-uc-image" src="/api/v3/attachments/113673/content"></div><figcaption class="op-uc-figure--description">Constraint Type: Start no earlier than</figcaption></figure>
*
*
* In the work packages module and the Gantt module there
* `Constraint type`
* `Constraint date`