Content
View differences
Updated by Christophe Bliard almost 2 years ago
### Before filing a report
_Before you file a report, please ensure you are running the latest version of OpenProject and_
_have searched for similar bug reports._ reports._
_Yup_
### Steps to reproduce
_Please write down the steps to reproduce. Try to write down all necessary preconditions (what permissions do you have, are other users involved?). Example:_
1. Create a new Budget as stated in the documentation and add planned labor costs for a user
2. Add a task and assign to budget
3. Log time on the Task
4. Open Budget and see that the entry is correctly added (actual labor costs) an the budget is lower by the tracked time
5. Log another Time Entry in the same work package for the same user
6. Reopen Budget and check actual labor costs
7. The total sum of costs updates correctly, however spend hours per task stay the same and so do cost per task
### What is the buggy behavior?
_Please describe the bug in as much detail as possible. Example:_
* The Spend time is calculated correctly in all other views (also in the budget details header and on the budgets overview) but not in the actual labor costs tab view
* For a given work package and user, only the last entered time entry is shown (whatever the date or category).
### What is the expected behavior?
_Describe how the application should behave like. Example:_
1. The actual labor costs detail view should summarize all time logs for a task so that hour spend and costs sum up to the totals of the last row.
2. All entered time entries should be shown for a given work package and user.
### Important note
_Please note that unless you are a contributor to OpenProject, you can no longer edit this bug report after saving. You can still add new comments, new images and upload attachments though, but updating description or modifying fields will not be possible after saving. Please make sure that all necessary information and attachments are added, and the following attributes are set:_
### **Logs**
_No Log Entries._
### Screenshots and other files
<img class="op-uc-image op-uc-image_inline" src="/api/v3/attachments/110000/content">
### Environment information
_Please check and fill out the following details to help us identify in what versions and distributions of OpenProject the error occurs_
**OpenProject installation type**
* [ ] Hosted cloud edition
* [x] Packaged installation
* Ubuntu 22.04
* [ ] Docker All-in-one container
* [ ] Docker-compose installation
* [ ] Other (please specify)
**OpenProject version**
_v14.2.0_
**Browser**
* [x] Chrome
* [ ] Firefox
* [ ] Safari
* [ ] Mobile Safari
* [ ] Other (please specify)
**Language**
_Browser: English; User: German_
_Before you file a report, please ensure you are running the latest version of OpenProject and_
_have searched for similar bug reports._
_Yup_
### Steps to reproduce
_Please write down the steps to reproduce. Try to write down all necessary preconditions (what permissions do you have, are other users involved?). Example:_
1. Create a new Budget as stated in the documentation and add planned labor costs for a user
2. Add a task and assign to budget
3. Log time on the Task
4. Open Budget and see that the entry is correctly added (actual labor costs) an the budget is lower by the tracked time
5. Log another Time Entry in the same work package for the same user
6. Reopen Budget and check actual labor costs
7. The total sum of costs updates correctly, however spend hours per task stay the same and so do cost per task
### What is the buggy behavior?
_Please describe the bug in as much detail as possible. Example:_
* The Spend time is calculated correctly in all other views (also in the budget details header and on the budgets overview) but not in the actual labor costs tab view
* For a given work package and user, only the last entered time entry is shown (whatever the date or category).
_Describe how the application should behave like. Example:_
1. The actual labor costs detail view should summarize all time logs for a task so that hour spend and costs sum up to the totals of the last row.
2. All entered time entries should be shown for a given work package and user.
### Important note
_Please note that unless you are a contributor to OpenProject, you can no longer edit this bug report after saving. You can still add new comments, new images and upload attachments though, but updating description or modifying fields will not be possible after saving. Please make sure that all necessary information and attachments are added, and the following attributes are set:_
### **Logs**
_No Log Entries._
### Screenshots and other files
<img class="op-uc-image op-uc-image_inline" src="/api/v3/attachments/110000/content">
### Environment information
_Please check and fill out the following details to help us identify in what versions and distributions of OpenProject the error occurs_
**OpenProject installation type**
* [ ] Hosted cloud edition
* [x] Packaged installation
* Ubuntu 22.04
* [ ] Docker All-in-one container
* [ ] Docker-compose installation
* [ ] Other (please specify)
**OpenProject version**
_v14.2.0_
**Browser**
* [x] Chrome
* [ ] Firefox
* [ ] Safari
* [ ] Mobile Safari
* [ ] Other (please specify)
**Language**
_Browser: English; User: German_