Content
You are here:
[Solved] Backlog plugin setup
Added by stelios stelios about 9 years ago
Hi!
I recently installed the latest version of openproject and I want to use the backlog plug in.
The question that I have is if it is possible to have different story types assigned to different types?
I set the types, the work package statuses and the workflow.
I have different types that use different statuses and different workflows.
No I want all of this to be visible to backlog.
So, I enter the backlog configuration and I want for example the story type “Graphic” to use the type Graphic and the story types“Code issues”, “Bugs” and “Tasks” to use the type “Tasks”.
Is this possible?
Thank you for your help!
Replies (2)
Hi Stelios,
thanks for your message.
The task type can only be configured globally for all story types (in Administration > Plugins > Backlogs > Configure). It’s not possible to assign different task types for each story type.
I would recommend you use a generic task type (e.g. “Task”) which can be used for all story types.
Hi Robin,
thank you for the quick response.
The solution you provided will do.
Thank you very much for your help!