Content
Activity
09/13/2013
-
updated by
Jens Ulferts on 09/13/2013 08:50 PM - Subject changed from Group assigned Issues to Group assigned work packages
-
created by
Michael Frister on 09/13/2013 04:04 PM -
updated by
Hagen Schink on 09/13/2013 03:47 PM - Status changed from needs review to merged
-
updated by
Nils Kenneweg on 09/13/2013 03:45 PM -
Comment added
Niels,
if one clicks on “today” in the datepicker, should the datepicker close?
Or should it remain open and only set th...
-
Comment added
-
updated by
Nils Kenneweg on 09/13/2013 03:39 PM - Story Points changed from 3 to 8
-
updated by
Stefan Frank on 09/13/2013 03:37 PM - Status changed from needs review to merged
-
updated by
Jens Ulferts on 09/13/2013 03:19 PM -
Comment added
Stefan merge Pull 429.
- Status changed from needs review to merged
-
Comment added
-
updated by
Jens Ulferts on 09/13/2013 03:15 PM -
Comment added
Stefan merged this.
- Status changed from needs review to merged
- Assignee deleted (
Stefan Frank)
-
Comment added
-
updated by
Jens Ulferts on 09/13/2013 03:13 PM -
Comment added
Both of those files are zipped. But inside they carry licenses of their own:
features/support/firebug-1.11.4.xpi
BSD...
- Status changed from in development to needs review
- Assignee changed from Jens Ulferts to Philipp Tessenow
-
Comment added
-
updated by
Christian Ratz on 09/13/2013 02:49 PM -
Comment added
Error from the log:
Error parsing svn output: #<REXML::ParseException: No close tag for /lists/list>
...
...
No cl...
- Type set to Bug
- Project set to OpenProject
- Subject set to Repository#show broken if one commit exists.
- Description set (Details)
- Status set to new
- Priority set to High
- Version deleted ()
- Author set to Christian Ratz
- % Complete set to 0%
- Scheduling mode set to Automatic
- Working days set to include non-working days
-
Comment added
-
updated by
Hagen Schink on 09/13/2013 02:48 PM - Description changed (Details)
-
updated by
Hagen Schink on 09/13/2013 02:44 PM -
Comment added
PR
- Status changed from in development to needs review
-
Comment added
-
updated by
Jens Ulferts on 09/13/2013 02:41 PM -
Comment added
I believe that the real work is now done on other tickets: OP-326, OP-557, OP-431, OP-558.
As such this should be closed...
- Assignee set to Sebastian Schuster
-
Comment added
-
updated by
Jens Ulferts on 09/13/2013 02:35 PM -
Comment added
Stefan, can you please take a look at what I did to your PR?
Internal CI says it’s green.
- Assignee changed from Jens Ulferts to Stefan Frank
-
Comment added
-
updated by
Jens Ulferts on 09/13/2013 02:34 PM -
Comment added
There are still a few things missing:
Links to project index with ?jump parameter still go to issues instead of work p...
- Status changed from on hold to needs review
-
Comment added
-
created by
Jens Ulferts on 09/13/2013 02:33 PM -
created by
Jens Ulferts on 09/13/2013 02:30 PM -
created by
Hagen Schink on 09/13/2013 02:19 PM -
updated by
Nils Kenneweg on 09/13/2013 02:03 PM - Status changed from new to in development
-
updated by
Nils Kenneweg on 09/13/2013 01:55 PM -
Comment added
I am not sure we still want to work on this ticket, as all the rails2 stuff is outdated.
I would put the ticket to rejec...
-
Comment added
-
created by
Jens Ulferts on 09/13/2013 01:48 PM -
updated by
Michael Frister on 09/13/2013 12:18 PM -
Comment added
According to Ratzi, the repository view doesn’t work at all when adding a commit. So I can’t QA this.
- Status changed from merged to on hold
-
Comment added
-
updated by
Michael Frister on 09/13/2013 12:16 PM -
Comment added
After creating a version in a project, I actually found a missing translation in the context menu: de.field_fixed_versio...
- Status changed from closed to on hold
-
Comment added
-
updated by
Michael Frister on 09/13/2013 12:08 PM -
Comment added
There are still a few things missing:
Links to project index with ?jump parameter still go to issues instead of work pa...
- Status changed from merged to on hold
-
Comment added
-
updated by
Jens Ulferts on 09/13/2013 11:59 AM -
Comment added
Reviewing Pull 429, which is a clean pull
- Assignee set to Jens Ulferts
-
Comment added
-
updated by
Jens Ulferts on 09/13/2013 11:51 AM -
Comment added
Putting it in the whish list again, for it to be reevaluated and placed soon.
- Subject changed from [Timelines] Data Migration Journals to [13/13] [Timelines] Data Migration Journals
-
Comment added
-
updated by
Jens Ulferts on 09/13/2013 11:49 AM - Type set to Feature
- Project set to OpenProject
- Subject set to [Timelines] Data Migration Journals (Placeholder for ä1793)
- Description set (Details)
- Status set to closed
- Priority set to Medium
- Version deleted ()
- Author set to Jens Ulferts
- % Complete set to 0%
- Story Points changed from 0 to 13
- Scheduling mode set to Automatic
- Working days set to include non-working days
-
updated by
Jens Ulferts on 09/13/2013 11:42 AM -
Comment added
I fixed most of the problems I came across. There are still two problems that in my eyes justify to stop development on ...
- Status changed from in development to on hold
-
Comment added
-
updated by
Nils Kenneweg on 09/13/2013 11:30 AM - Description changed (Details)
- Status changed from on hold to needs review
-
updated by
Christian Ratz on 09/13/2013 11:27 AM - Status changed from merged to closed
- Assignee deleted (
Nils Kenneweg)
-
updated by
Christian Rijke on 09/13/2013 11:26 AM - Status changed from merged to closed
-
updated by
Christian Rijke on 09/13/2013 11:26 AM - Status changed from merged to closed
-
updated by
Christian Ratz on 09/13/2013 11:23 AM -
Comment added
Update:
It only works for the “view all projects” link.
-
Comment added
-
updated by
Christian Ratz on 09/13/2013 11:21 AM - Status changed from merged to closed
- Assignee deleted (
Nils Kenneweg)
-
updated by
Christian Ratz on 09/13/2013 11:16 AM -
Comment added
Not working in FF, Chrome or Safari.
- Status changed from merged to on hold
-
Comment added
-
updated by
Michael Frister on 09/13/2013 11:09 AM -
Comment added
There are fewer options in the context menu now, but this probably has other reasons.
The missing translations are fixed...
- Status changed from merged to closed
-
Comment added
-
updated by
Stefan Frank on 09/13/2013 10:52 AM -
Comment added
just works.
- Status changed from merged to closed
-
Comment added
-
updated by
Hagen Schink on 09/13/2013 10:08 AM - Status changed from merged to closed
- % Complete changed from 40% to 60%
-
updated by
Hagen Schink on 09/13/2013 10:07 AM - Status changed from in development to closed
- % Complete changed from 25% to 100%
-
updated by
Hagen Schink on 09/13/2013 10:07 AM - Status changed from merged to closed
-
updated by
Hagen Schink on 09/13/2013 10:06 AM - Status changed from in development to closed
-
updated by
Hagen Schink on 09/13/2013 10:06 AM - Status changed from merged to closed
-
updated by
Hagen Schink on 09/13/2013 10:06 AM - % Complete changed from 0% to 50%
-
updated by
Hagen Schink on 09/13/2013 10:06 AM - Status changed from merged to closed
-
updated by
Hagen Schink on 09/13/2013 10:05 AM - Status changed from merged to closed
-
updated by
Hagen Schink on 09/13/2013 10:05 AM - Status changed from merged to closed
-
updated by
Jens Ulferts on 09/13/2013 09:08 AM -
Comment added
This bug does also apply to messages.
-
Comment added
-
created by
Jens Ulferts on 09/13/2013 08:33 AM
09/12/2013
-
updated by
Stefan Frank on 09/12/2013 06:22 PM -
Comment added
The reported error is fixed in Pull 428, validation-errors are now handled properly.
- Status changed from on hold to needs review
-
Comment added
-
updated by
Birthe Lindenthal on 09/12/2013 06:09 PM -
Comment added
Hi Tessi,
see my anwers in OF-69. Let’s talk on Monday about this topic.
Cheers.
Birthe
- Assignee changed from Birthe Lindenthal to Philipp Tessenow
-
Comment added
-
updated by
Hagen Schink on 09/12/2013 05:06 PM - The changes were retracted.
-
updated by
Hagen Schink on 09/12/2013 04:56 PM - Type changed from Task to Feature
-
updated by
Hagen Schink on 09/12/2013 04:55 PM - Version set to Wish List
- Parent changed from Migration planning element types to Migrate legacy planning elements
-
updated by
Hagen Schink on 09/12/2013 04:54 PM - Description changed (Details)
-
updated by
Hagen Schink on 09/12/2013 04:42 PM - Description changed (Details)
-
updated by
Hagen Schink on 09/12/2013 04:12 PM - Description changed (Details)
-
created by
Hagen Schink on 09/12/2013 04:04 PM -
updated by
Hagen Schink on 09/12/2013 03:44 PM - Subject changed from No journal entry created for attachments if the attachment is added on container creation
to [13/13] No journal entry created for attachments if the attachment is added on container creation - Status changed from new to confirmed
- Subject changed from No journal entry created for attachments if the attachment is added on container creation
-
updated by
Jens Ulferts on 09/12/2013 03:38 PM -
Comment added
I propose fixing this in the next sprint. Otherwise we risk corrupted data.
- Type set to Bug
- Project set to OpenProject
- Subject set to No journal entry created for attachments if the attachment is added on container creation
- Description set (Details)
- Status set to new
- Priority set to High
- Version set to Wish List
- Author set to Jens Ulferts
- % Complete set to 0%
- Scheduling mode set to Automatic
- Working days set to include non-working days
-
Comment added
-
updated by
Hagen Schink on 09/12/2013 03:33 PM - Status changed from new to in development
- Story Points changed from 0 to 13
-
updated by
Hagen Schink on 09/12/2013 03:23 PM - Status changed from new to on hold
-
updated by
Stefan Frank on 09/12/2013 03:18 PM -
Comment added
pull 411 has already been merged.
- Status changed from needs review to merged
- % Complete changed from 20% to 40%
-
Comment added
-
updated by
Stefan Frank on 09/12/2013 03:18 PM -
Comment added
This has already happened together with all the other issue-stuff in Pull 472
- Status changed from new to rejected
-
Comment added
-
updated by
Hagen Schink on 09/12/2013 03:09 PM - Description changed (Details)
- Status changed from needs review to on hold
-
updated by
Hagen Schink on 09/12/2013 03:01 PM - Status changed from needs review to merged
-
updated by
Hagen Schink on 09/12/2013 02:52 PM - Status changed from needs review to merged
-
updated by
Hagen Schink on 09/12/2013 02:13 PM - Status changed from needs review to merged
-
updated by
Hagen Schink on 09/12/2013 02:06 PM - Status changed from on hold to merged
- Version deleted ()
-
updated by
Hagen Schink on 09/12/2013 01:49 PM - Status changed from needs review to on hold
-
created by
Hagen Schink on 09/12/2013 01:38 PM -
updated by
Hagen Schink on 09/12/2013 12:52 PM - Status changed from in development to needs review
-
updated by
Hagen Schink on 09/12/2013 12:01 PM - Status changed from in development to needs review
-
updated by
Hagen Schink on 09/12/2013 12:00 PM - % Complete changed from 17% to 25%
-
updated by
Hagen Schink on 09/12/2013 12:00 PM - Type changed from Task to Feature
- Parent deleted (
[Timelines] Remove Issue and replace with Work Package)
-
updated by
Hagen Schink on 09/12/2013 11:59 AM - Type changed from Task to Feature
- Parent deleted (
[Timelines] Remove Issue and replace with Work Package)
-
updated by
Hagen Schink on 09/12/2013 11:59 AM - Type changed from Task to Feature
- Status changed from needs review to closed
- Parent deleted (
[Timelines] Remove Issue and replace with Work Package)
-
updated by
Hagen Schink on 09/12/2013 11:58 AM - Type changed from Task to Feature
- Parent deleted (
[Timelines] Remove Issue and replace with Work Package)
-
updated by
Hagen Schink on 09/12/2013 11:57 AM - Status changed from needs review to merged
-
updated by
Hagen Schink on 09/12/2013 11:57 AM - Status changed from needs review to merged
-
updated by
Stefan Frank on 09/12/2013 11:54 AM -
Comment added
…or delete it altogether, this is what happened in Pull 427
- Status changed from new to needs review
-
Comment added
-
updated by
Stefan Frank on 09/12/2013 11:52 AM -
Comment added
references to the link have been removed, now the link is also gone from the application-helper (also happened in Pull 4...
- Status changed from new to needs review
-
Comment added
-
updated by
Michael Frister on 09/12/2013 11:04 AM - Status changed from new to in development
-
updated by
Michael Frister on 09/12/2013 11:04 AM - Status changed from new to in development
-
updated by
Michael Frister on 09/12/2013 11:04 AM - Status changed from new to in development
09/11/2013
-
updated by
Nils Kenneweg on 09/11/2013 05:24 PM - Status changed from needs review to merged
-
updated by
Nils Kenneweg on 09/11/2013 05:10 PM - Status changed from confirmed to merged
- Version deleted ()
-
updated by
Stefan Frank on 09/11/2013 05:00 PM - Description changed (Details)
-
updated by
Nils Kenneweg on 09/11/2013 03:37 PM - Status changed from confirmed to needs review
- Assignee set to Nils Kenneweg
- Story Points changed from 1 to 0
-
updated by
Nils Kenneweg on 09/11/2013 03:06 PM - Status changed from specified to needs review
-
updated by
Nils Kenneweg on 09/11/2013 02:32 PM -
Comment added
1. This is not a modal problem.
2. I am pretty sure the cancel button acts as specified here. We can of course discuss a...
- Status changed from confirmed to rejected
-
Comment added
-
updated by
Nils Kenneweg on 09/11/2013 01:55 PM -
Comment added
We do need to specify this a little more.
If we click on a modal-link inside of our modal, what is the expected behaviou...
-
Comment added
-
updated by
Nils Kenneweg on 09/11/2013 01:54 PM - Version deleted (
Wish List)
- Version deleted (
-
updated by
Nils Kenneweg on 09/11/2013 01:54 PM - Version deleted (
Wish List)
- Version deleted (
-
updated by
Johannes Wollert on 09/11/2013 01:52 PM - Version deleted (
Wish List) - Story Points changed from 0 to 2
- Version deleted (
-
updated by
Johannes Wollert on 09/11/2013 01:52 PM - Story Points changed from 0 to 5
-
updated by
Johannes Wollert on 09/11/2013 01:50 PM - Story Points changed from 0 to 3
-
updated by
Johannes Wollert on 09/11/2013 01:48 PM - Story Points changed from 0 to 8
-
updated by
Johannes Wollert on 09/11/2013 01:40 PM - Story Points changed from 0 to 3
-
updated by
Johannes Wollert on 09/11/2013 01:35 PM - Story Points changed from 0 to 5
-
updated by
Johannes Wollert on 09/11/2013 01:33 PM - Story Points changed from 0 to 1
-
updated by
Jens Ulferts on 09/11/2013 01:15 PM -
Comment added
When making a test migration in order to review OP-447 I wrote a rake task to enable the migrations to run. Please find ...
- File reregister_timelines_migrations.rake added as attachment
-
Comment added
-
updated by
Jens Ulferts on 09/11/2013 01:10 PM -
Comment added
When applying this migration to a current openproject.org dump some problems arise. So I would like to continue developm...
- Status changed from needs review to in development
- Assignee changed from Martin Czuchra to Jens Ulferts
-
Comment added
-
updated by
Hagen Schink on 09/11/2013 11:56 AM - Type set to Feature
- Project set to OpenProject
- Subject set to Migrate activities
- Description set (Details)
- Status set to new
- Priority set to Medium
- Author set to Hagen Schink
- % Complete set to 0%
- Parent set to Complete data migration
- Scheduling mode set to Automatic
- Working days set to include non-working days
-
updated by
Hagen Schink on 09/11/2013 11:39 AM - Story Points changed from 0 to 37
-
updated by
Hagen Schink on 09/11/2013 11:39 AM - Subject changed from Consider project hierarchy changes to [13] Consider project hierarchy changes
- Status changed from specified to new
- Version set to Wish List
- Parent deleted (
[13/13] Project Plan Comparison)
-
updated by
Birthe Lindenthal on 09/11/2013 11:34 AM -
Comment added
Just taked with Christian and Ratzi about this Topic. We should initiate this together with the update of openproject.or...
- Type set to Feature
- Project set to OpenProject
- Subject set to Set up sandbox.openproject.org
- Description set (Details)
- Status set to new
- Priority set to Medium
- Version deleted ()
- Author set to Birthe Lindenthal
- % Complete set to 0%
- Scheduling mode set to Automatic
- Working days set to include non-working days
-
Comment added
-
updated by
Hagen Schink on 09/11/2013 11:31 AM - Story Points changed from 0 to 13
-
updated by
Hagen Schink on 09/11/2013 11:30 AM - The changes were retracted.
-
updated by
Hagen Schink on 09/11/2013 11:29 AM - The changes were retracted.
-
updated by
Birthe Lindenthal on 09/11/2013 11:29 AM - Type set to Feature
-
updated by
Birthe Lindenthal on 09/11/2013 11:29 AM - Type set to Feature
-
updated by
Hagen Schink on 09/11/2013 11:28 AM - The changes were retracted.
-
updated by
Hagen Schink on 09/11/2013 11:27 AM - The changes were retracted.
-
updated by
Hagen Schink on 09/11/2013 11:18 AM - Story Points changed from 0 to 16
-
created by
Hagen Schink on 09/11/2013 11:17 AM -
updated by
Hagen Schink on 09/11/2013 11:15 AM - Type set to Task
- Project set to OpenProject
- Subject set to Cukes for timelines start/end date comparison
- Status set to new
- Priority set to Medium
- Author set to Hagen Schink
- % Complete set to 0%
- Parent set to Start/End date comparison
- Scheduling mode set to Automatic
- Working days set to include non-working days
-
updated by
Hagen Schink on 09/11/2013 11:11 AM - The changes were retracted.
-
updated by
Hagen Schink on 09/11/2013 11:01 AM - The changes were retracted.
-
created by
Hagen Schink on 09/11/2013 10:42 AM -
updated by
Niels Lindenthal on 09/11/2013 10:05 AM -
Comment added
Hi Nils,
can you please have a look at this bug. Maybe we should use this bug as a chance to replace this datepicker. It...
- Assignee set to Nils Kenneweg
- Version deleted (
Wish List)
-
Comment added
-
updated by
Michael Frister on 09/11/2013 09:31 AM - Subject changed from Grey line near the lower end of the modal, cuts of a bit of the content to Grey line near the lower end of the modal, cuts off a bit of the content
-
updated by
Hagen Schink on 09/11/2013 08:35 AM - Version deleted (
Wish List) - Parent changed from Complete data migration to Migration planning element types
- Version deleted (
-
updated by
Hagen Schink on 09/11/2013 08:35 AM - Description changed (Details)
-
created by
Hagen Schink on 09/11/2013 08:33 AM -
created by
Hagen Schink on 09/11/2013 08:29 AM -
created by
Hagen Schink on 09/11/2013 08:25 AM -
created by
Hagen Schink on 09/11/2013 08:19 AM -
updated by
Hagen Schink on 09/11/2013 08:18 AM - Type set to Task
- Project set to OpenProject
- Subject set to Define approach for existing rights
- Description set (Details)
- Status set to new
- Assignee set to Niels Lindenthal
- Priority set to Medium
- Author set to Hagen Schink
- % Complete set to 0%
- Parent set to Migration user rights
- Scheduling mode set to Automatic
- Working days set to include non-working days
-
created by
Hagen Schink on 09/11/2013 08:17 AM -
created by
Hagen Schink on 09/11/2013 08:12 AM -
updated by
Hagen Schink on 09/11/2013 08:11 AM - Type set to Feature
- Project set to OpenProject
- Subject set to [14/13] Migrate timelines reports
- Description set (Details)
- Status set to new
- Priority set to Medium
- Version set to Wish List
- Author set to Hagen Schink
- % Complete set to 0%
- Parent set to Complete data migration
- Scheduling mode set to Automatic
- Working days set to include non-working days
-
created by
Hagen Schink on 09/11/2013 08:07 AM -
updated by
Hagen Schink on 09/11/2013 08:06 AM - Status changed from new to specified
-
created by
Hagen Schink on 09/11/2013 08:05 AM -
created by
Hagen Schink on 09/11/2013 08:04 AM -
created by
Hagen Schink on 09/11/2013 07:58 AM -
created by
Hagen Schink on 09/11/2013 07:56 AM -
created by
Hagen Schink on 09/11/2013 07:54 AM -
created by
Hagen Schink on 09/11/2013 07:51 AM -
updated by
Hagen Schink on 09/11/2013 07:41 AM - Status changed from new to specified
-
updated by
Hagen Schink on 09/11/2013 07:39 AM - Description changed (Details)
-
updated by
Hagen Schink on 09/11/2013 07:39 AM - Description changed (Details)
- Status changed from new to confirmed
-
updated by
Hagen Schink on 09/11/2013 07:38 AM - Description changed (Details)
- Status changed from new to confirmed
-
updated by
Hagen Schink on 09/11/2013 07:37 AM - Description changed (Details)
- Status changed from new to confirmed
-
updated by
Hagen Schink on 09/11/2013 07:36 AM - Status changed from new to confirmed
-
updated by
Hagen Schink on 09/11/2013 07:36 AM - Status changed from new to confirmed
09/10/2013
-
updated by
Stefan Frank on 09/10/2013 05:54 PM - Description changed (Details)
-
updated by
Michael Frister on 09/10/2013 04:54 PM - Status changed from new to in development
- Assignee set to Michael Frister
-
updated by
Philipp Tessenow on 09/10/2013 03:43 PM -
Comment added
tested this for openproject-plugins. seems to work fine.
- Status changed from needs review to closed
-
Comment added
-
updated by
Philipp Tessenow on 09/10/2013 03:34 PM - Status changed from needs review to merged
-
updated by
Philipp Tessenow on 09/10/2013 02:09 PM -
Comment added
delegated subtasks to jens/birthe. i’m outa here! :)
- Assignee deleted (
Philipp Tessenow)
-
Comment added
-
updated by
Philipp Tessenow on 09/10/2013 02:03 PM -
Comment added
@birthe: please have a look at martins questions in OF-69 too.
-
Comment added
-
updated by
Christian Ratz on 09/10/2013 10:18 AM -
Comment added
done in PR420
- Status changed from in development to needs review
- Assignee deleted (
Christian Ratz)
-
Comment added
-
updated by
Hagen Schink on 09/10/2013 08:11 AM - Status changed from on hold to in development
09/09/2013
-
updated by
Martin Czuchra on 09/09/2013 05:57 PM - Status changed from needs review to merged
-
updated by
Martin Czuchra on 09/09/2013 05:56 PM - Status changed from needs review to merged
-
updated by
Birthe Lindenthal on 09/09/2013 05:20 PM -
Comment added
I have asked Till Jaeger for advise, waiting for an answer.
-
Comment added
-
updated by
Philipp Tessenow on 09/09/2013 03:45 PM - The changes were retracted.
-
created by
Stefan Frank on 09/09/2013 03:26 PM -
updated by
Jens Ulferts on 09/09/2013 02:54 PM -
Comment added
Moving this into the sprint, as I fixed it in passing while working on OP-326.
- Status changed from confirmed to needs review
- Version deleted ()
-
Comment added
-
updated by
Jens Ulferts on 09/09/2013 01:59 PM -
Comment added
All directing to the issues controller should no longer occur. The exception I am aware of is for bulk_edit/bulk_update ...
- Status changed from on hold to needs review
- Version deleted ()
-
Comment added
-
updated by
Philipp Tessenow on 09/09/2013 01:13 PM -
Comment added
also not sure about language translations (@birthe):
config/locales/de.yml
config/locales/en.yml
and test-data:
test/...
- Status changed from new to in development
-
Comment added
-
updated by
Martin Czuchra on 09/09/2013 01:12 PM -
Comment added
I guess you meant this on in today’s scrum meeting?
- Assignee set to Jens Ulferts
-
Comment added
-
updated by
Philipp Tessenow on 09/09/2013 01:11 PM -
Comment added
not sure about configuration files
config/cucumber.yml
config/settings.yml
config/i18n-js.yml
config/tinymce.yml
config...
- Assignee changed from Philipp Tessenow to Birthe Lindenthal
-
Comment added
-
updated by
Martin Czuchra on 09/09/2013 01:11 PM -
Comment added
The way I see it, this is implemented in https://github.com/opf/openproject/pull/392
Goes to on hold after review on Thu...
- Status changed from needs review to on hold
-
Comment added
-
updated by
Philipp Tessenow on 09/09/2013 01:09 PM -
Comment added
todo: ask for permission (listed first commit of every author; removed finn/opf commits):
extra/sv/create_views.sql
...
-
Comment added
-
updated by
Philipp Tessenow on 09/09/2013 12:53 PM -
Comment added
features/support/firebug-1.11.4.xpi
features/support/firepath-0.9.7-fx.xpi
have been checked in by jens/sebastian. I a...
- Assignee changed from Philipp Tessenow to Jens Ulferts
-
Comment added
-
updated by
Martin Czuchra on 09/09/2013 10:18 AM -
Comment added
Well, this is kind of a known problem. We would need a certain amount of comminucation between iframe host and guest to ...
- Description changed (Details)
-
Comment added
-
updated by
Christian Ratz on 09/09/2013 09:04 AM - Description changed (Details)
- Status changed from new to in development
- Assignee set to Christian Ratz
Also available in: Atom