**As** a project manager and project portfolio manager
**I want to** have a terminology in OpenProject which maps to my existing training in project management (PM2, PMflex)
**so that** I easily get familiar with adapting OpenProject in my projects.
**As** a project portfolio manager
**I want to** have gates be a property of a phase
**so that** I have an easier time managing them.
**Acceptance criteria**
* General:
* Gates are no longer a separate entity but a property of a phase.
* For now, phases can be configured to have a gate at the end. A name can be assigned to that gate that is independent of the phase name.
* Phases were named stages before. This is to be changed throughout the application. Gates are to be called "Phase gates".
* Technical: The change in name it reflected throughout the code base.
* The icons uses to visualize gates (and phase gates) is changed according to the figma file.
* Phases can have up to two gates. One at the start and one at the end.
* Global administration:
* The edit page of a phase has a boolean for activating the phase gate and an input for the name of the gate.
* The index page of the global administration shows the gates as a property of the phase.
* Project administration:
* The project administration displays the gates as a property of the phase. The activation state of a gate is therefore always toggled together with its phase.
* \[open\] How to display the gate name?
* Project list:
* Filters:
* The filters on lifecycle elements need to be adapted but the functionality of the filters remains the same.
* Columns:
* Gates are no longer separate columns. Instead, the column for a phase shows the gate as well.
* \[open\] How to display the gate name?
* Project overview:
* In the sidebar, the phases are listed (icon changes?)
* Gates are symbolized by an icon next to the phase dates.
* Seeding:
* The seed data following PM2 is adapted so that the gates are now properties of the phases.
* The work package type currently called "Phase" is renamed in the seed data according to the table in the "Translation considerations" section.
* Migration:
* Existing life cycle gates following a phase are to be converted to phase gates of the preceding phase.
* Gates at the very beginning (before a phase) are ignored and will just vanish. The feature is still behind a feature flag and the seeded data does not have this edge case.
* Project lists don't need to be migrated. The feature flag is not migrated but removed instead. This includes step definitions, steps still in projects, the journals connected to this and project queries referencing those steps. place.
* Journalization
* \[open\] Probably the journalization would change and become simpler. It needs to be determined if the gates remain to be mentioned separately. Proposal: They are not.
**Out of scope**
* There is migration changing the work package type "Phase" to "Summary task"
**Translation considerations**
<figure class="table op-uc-figure_align-center op-uc-figure"><table class="op-uc-table"><thead class="op-uc-table--head"><tr class="op-uc-table--row"><th class="op-uc-table--cell op-uc-table--cell_head"><p class="op-uc-p">Current</p></th><th class="op-uc-table--cell op-uc-table--cell_head" style="text-align:center;" colspan="5"><p class="op-uc-p">New</p></th></tr></thead><tbody><tr class="op-uc-table--row"><td class="op-uc-table--cell"><p class="op-uc-p"><br></p></td><td class="op-uc-table--cell"><p class="op-uc-p"><strong>EN</strong></p></td><td class="op-uc-table--cell"><p class="op-uc-p"><strong>FR</strong></p></td><td class="op-uc-table--cell"><p class="op-uc-p"><strong>DE</strong></p></td><td class="op-uc-table--cell"><p class="op-uc-p"><strong>ES</strong></p></td><td class="op-uc-table--cell"><p class="op-uc-p"><strong>IT</strong></p></td></tr><tr class="op-uc-table--row"><td class="op-uc-table--cell"><p class="op-uc-p">Stage</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Phase</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Phase</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Phase</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Fase</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Fase</p></td></tr><tr class="op-uc-table--row"><td class="op-uc-table--cell"><p class="op-uc-p">Gate</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Phase gate</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Point de contrôle</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Phasenübergang</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Puertas de Fase</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Passaggio di fase</p></td></tr><tr class="op-uc-table--row"><td class="op-uc-table--cell"><p class="op-uc-p"><strong>Work package types in seed data</strong></p></td><td class="op-uc-table--cell"><p class="op-uc-p"><br></p></td><td class="op-uc-table--cell"><p class="op-uc-p"><br></p></td><td class="op-uc-table--cell"><p class="op-uc-p"><br></p></td><td class="op-uc-table--cell"><p class="op-uc-p"><br></p></td><td class="op-uc-table--cell"><p class="op-uc-p"><br></p></td></tr><tr class="op-uc-table--row"><td class="op-uc-table--cell"><p class="op-uc-p">Phase</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Summary task</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Tâche récapitulative</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Sammelvorgang</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Tarea de resumen</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Attività di riepilogo</p></td></tr></tbody></table></figure>
**Figma link**
https://www.figma.com/design/4Z950sfYbceOqUN6sFV7Mr/Project-Portfolios%3A-Stages-and-Gates?node-id=2241-25240&p=f&t=KDojqVwe6z9BG8Ze-0
**I want to** have a terminology in OpenProject which maps to my existing training in project management (PM2, PMflex)
**so that** I easily get familiar with adapting OpenProject in my projects.
**As** a project portfolio manager
**I want to** have gates be a property of a phase
**so that** I have an easier time managing them.
**Acceptance criteria**
* General:
* Gates are no longer a separate entity but a property of a phase.
* For now, phases can be configured to have a gate at the end. A name can be assigned to that gate that is independent of the phase name.
* Phases were named stages before. This is to be changed throughout the application. Gates are to be called "Phase gates".
* Technical: The change in name it reflected throughout the code base.
* The icons uses to visualize gates (and phase gates) is changed according to the figma file.
* Phases can have up to two gates. One at the start and one at the end.
* Global administration:
* The edit page of a phase has a boolean for activating the phase gate and an input for the name of the gate.
* The index page of the global administration shows the gates as a property of the phase.
* Project administration:
* The project administration displays the gates as a property of the phase. The activation state of a gate is therefore always toggled together with its phase.
* \[open\] How to display the gate name?
* Project list:
* Filters:
* The filters on lifecycle elements need to be adapted but the functionality of the filters remains the same.
* Columns:
* Gates are no longer separate columns. Instead, the column for a phase shows the gate as well.
* \[open\] How to display the gate name?
* Project overview:
* In the sidebar, the phases are listed (icon changes?)
* Gates are symbolized by an icon next to the phase dates.
* Seeding:
* The seed data following PM2 is adapted so that the gates are now properties of the phases.
* The work package type currently called "Phase" is renamed in the seed data according to the table in the "Translation considerations" section.
* Migration:
* Existing life cycle
* Gates at the very beginning (before a phase) are ignored and will just vanish. The feature is still behind a feature flag and the seeded
* Project lists don't need to be migrated. The feature flag
* Journalization
* \[open\] Probably the journalization would change and become simpler. It needs to be determined if the gates remain to be mentioned separately. Proposal: They are not.
**Out of scope**
* There is migration changing the work package type "Phase" to "Summary task"
**Translation considerations**
<figure class="table op-uc-figure_align-center op-uc-figure"><table class="op-uc-table"><thead class="op-uc-table--head"><tr class="op-uc-table--row"><th class="op-uc-table--cell op-uc-table--cell_head"><p class="op-uc-p">Current</p></th><th class="op-uc-table--cell op-uc-table--cell_head" style="text-align:center;" colspan="5"><p class="op-uc-p">New</p></th></tr></thead><tbody><tr class="op-uc-table--row"><td class="op-uc-table--cell"><p class="op-uc-p"><br></p></td><td class="op-uc-table--cell"><p class="op-uc-p"><strong>EN</strong></p></td><td class="op-uc-table--cell"><p class="op-uc-p"><strong>FR</strong></p></td><td class="op-uc-table--cell"><p class="op-uc-p"><strong>DE</strong></p></td><td class="op-uc-table--cell"><p class="op-uc-p"><strong>ES</strong></p></td><td class="op-uc-table--cell"><p class="op-uc-p"><strong>IT</strong></p></td></tr><tr class="op-uc-table--row"><td class="op-uc-table--cell"><p class="op-uc-p">Stage</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Phase</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Phase</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Phase</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Fase</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Fase</p></td></tr><tr class="op-uc-table--row"><td class="op-uc-table--cell"><p class="op-uc-p">Gate</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Phase gate</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Point de contrôle</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Phasenübergang</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Puertas de Fase</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Passaggio di fase</p></td></tr><tr class="op-uc-table--row"><td class="op-uc-table--cell"><p class="op-uc-p"><strong>Work package types in seed data</strong></p></td><td class="op-uc-table--cell"><p class="op-uc-p"><br></p></td><td class="op-uc-table--cell"><p class="op-uc-p"><br></p></td><td class="op-uc-table--cell"><p class="op-uc-p"><br></p></td><td class="op-uc-table--cell"><p class="op-uc-p"><br></p></td><td class="op-uc-table--cell"><p class="op-uc-p"><br></p></td></tr><tr class="op-uc-table--row"><td class="op-uc-table--cell"><p class="op-uc-p">Phase</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Summary task</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Tâche récapitulative</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Sammelvorgang</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Tarea de resumen</p></td><td class="op-uc-table--cell"><p class="op-uc-p">Attività di riepilogo</p></td></tr></tbody></table></figure>
**Figma link**
https://www.figma.com/design/4Z950sfYbceOqUN6sFV7Mr/Project-Portfolios%3A-Stages-and-Gates?node-id=2241-25240&p=f&t=KDojqVwe6z9BG8Ze-0