Content
View differences
Updated by Niels Lindenthal about 1 year ago
**As** a project portfolio manager
**I want to** enter and modify the project lifecycle dates in a date picker
**so that** have more tool-support to understand the scheduling
**Acceptance criteria**
* specified in ##59177 Select scheduling mode.
* Manual
* Automatic (connected to predessor)
* Include non-working days
* Single date selection (Gate)
* Range mode (Stage)
* The date picker is openend when editing a single stage or gate.
**Technical notes**
* <br>
**Permissions and visibility considerations**
* _No additional_ _tbd_
**Out of scope**
* Seeing the results of automatic scheduling before saving.
* The scheduling itself
**I want to** enter and modify the project lifecycle dates in a date picker
**Acceptance criteria**
* specified in ##59177
* Manual
* Automatic (connected to predessor)
* Include non-working days
* Single date selection (Gate)
* Range mode (Stage)
* The date picker is openend when editing a single stage or gate.
**Technical notes**
* <br>
**Permissions and visibility considerations**
* _No additional_
**Out of scope**
* Seeing the results of automatic scheduling before saving.
* The scheduling itself