Content
View differences
Updated by Cécile Guiot over 1 year ago
### Steps to reproduce
1. open a Gantt View
2. open the details view of a work package with (i)
3. Open Date enter a date (Milestone type ticket) using the "Date" popup
4. Enter a date click "save" in any other format than YYYY-MM-DD. E.g. 2024-2-15, or 15 Feb 2024 the popup
5. The popup will CORRECTLY parse the entry closes, and show the date that was intended, even when it was in details view correctly shows the wrong format.
6. Click "save"
7. The work package will show the correct date, in the format "15 Feb 2024" - _**BUT IT WILL NOT UPDATE.**_
8. _**From there on, no more changes to the work packages are possible - unless it is reloaded ("accept to leave page").**_ Nothing leads to an update, no fields, no subject, no description changes, not even deleting the entered date again.
### What is the buggy behavior?
* the Gantt list itself shows _**no date change**_
* when the work package is opened anywhere else, the _**date is still missing**_
* _**Reloading the list reverts all changes**_
### What is the expected behavior?
Entering or changing a date should enter or change the date in the actual work package data and never show the change in the detail view unless it was actually saved.
If the work package form shows the changed date, the user assumes it is actually changed everywhere else.
### Environment information
OpenProject 14.6.1 Enterprise Cloud Subscription
Firefox 131.0.2, Windows 11
**Browser**
* [ ] Chrome
* [x] Firefox
* [ ] Safari
* [ ] Mobile Safari
* [ ] Other (please specify)
**Operating System**
* [x] Windows
* [ ] Mac OS X
* [ ] Mobile iOS
* [ ] Mobile Android
* [ ] Linux (please specify distro)
* [ ] Chrome OS
* [ ] Other (please specify)
**Language**
English
1. open a Gantt View
2. open the details view of a work package with (i)
3. Open Date
4. Enter a date
5. The popup will CORRECTLY parse the entry
6. Click "save"
7. The work package will show the correct date, in the format "15 Feb 2024" - _**BUT IT WILL NOT UPDATE.**_
8. _**From there on, no more changes to the work packages are possible - unless it is reloaded ("accept to leave page").**_ Nothing leads to an update, no fields, no subject, no description changes, not even deleting the
### What is the buggy behavior?
* the Gantt list itself shows _**no date change**_
* when the work package is opened anywhere else, the _**date is still missing**_
* _**Reloading the list reverts all changes**_
### What is the expected behavior?
Entering or changing a date should enter or change the date in the actual work package data and never show the change in the detail view unless it was actually saved.
If the work package form shows the changed date, the user assumes it is actually changed everywhere else.
### Environment information
OpenProject 14.6.1 Enterprise Cloud Subscription
Firefox 131.0.2, Windows 11
**Browser**
* [ ] Chrome
* [x] Firefox
* [ ] Safari
* [ ] Mobile Safari
* [ ] Other (please specify)
**Operating System**
* [x] Windows
* [ ] Mac OS X
* [ ] Mobile iOS
* [ ] Mobile Android
* [ ] Linux (please specify distro)
* [ ] Chrome OS
* [ ] Other (please specify)
**Language**
English