Content
View differences
Updated by Parimal Satyal almost 4 years ago
**As** a project admin
**I want to** define the working days of the week for my OpenProject instance
**so that** weekends are correctly displayed and taken into account in all modules that involve dates (date picker, GANTT, team planner, calendar...).
**Acceptance criteria**
* The icon for this entry is the existing "**icon-calendar**" (visible in the sidebar and on the overview pages).
* The page has a title: "Working days"
* Text:
* **Define the working days of the week**
Non-working days are skipped when scheduling work packages and are excluded when calculating duration. These can be overriden at a work-package level.
* This is followed by the horizontal row of checkboxes, one for each day of the week.
* Monday–Friday are selected by default.
* Saturday and Sunday are unselected by default.
* **Mobile:** On smaller screens, the list become vertical, with only one element per line.
* A save button exists and works like on every other settings page.
**Added 18 August:**
* When an admin makes a change to which dates are considered non-working days (checking or unchecking one or several days), they should be warned that since this is an instance-level setting that might (and almost certainly will) affect the scheduling of work packages in all projects. This warning has to make this potential consequence abundantly clear, since:
* the admin cannot preview these consequences to scheduling of this change
* the change has the potential of trigger a large number of notifications for a large number of users
* **The product team are currently working on specifying how to display this warning.**
**Visuals**
<img class="op-uc-image op-uc-image_inline" src="/api/v3/attachments/36808/content">
**Figma**
https://www.figma.com/file/SMzHAQWcY9k0PkTEKd5UQn/Duration-and-Non-Working-Days?node-id=1667%3A46400
**I want to** define the working days of the week for my OpenProject instance
**so that** weekends are correctly displayed and taken into account in all modules that involve dates (date picker, GANTT, team planner, calendar...).
**Acceptance criteria**
* The icon for this entry is the existing "**icon-calendar**" (visible in the sidebar and on the overview pages).
* The page has a title: "Working days"
* Text:
* **Define the working days of the week**
Non-working days are skipped when scheduling work packages and are excluded when calculating duration. These can be overriden at a work-package level.
* This is followed by the horizontal row of checkboxes, one for each day of the week.
* Monday–Friday are selected by default.
* Saturday and Sunday are unselected by default.
* **Mobile:** On smaller screens, the list become vertical, with only one element per line.
* A save button exists and works like on every other settings page.
**Added 18 August:**
* When an admin makes a change to which dates are considered non-working days (checking or unchecking one or several days), they should be warned that since this is an instance-level setting that might (and almost certainly will) affect the scheduling of work packages in all projects. This warning has to make this potential consequence abundantly clear, since:
* the admin cannot preview these consequences to scheduling of this change
* the change has the potential of trigger a large number of notifications for a large number of users
* **The product team are currently working on specifying how to display this warning.**
**Visuals**
<img class="op-uc-image op-uc-image_inline" src="/api/v3/attachments/36808/content">
**Figma**
https://www.figma.com/file/SMzHAQWcY9k0PkTEKd5UQn/Duration-and-Non-Working-Days?node-id=1667%3A46400