Content
View differences
Updated by Niels Lindenthal over 4 years ago
**As** a user of the team planner or the calendar project member
**I want to** change the date of work packages by drag and dropĀ drop calendar elements in the calendar
**so that** I can do the planning directly inside in the module without opening calendar view (at the work package moment I need to make the change in the split view.
**Acceptance criteria**
* Success messages and error handling
* Hover effects for drag and drop
* Moving similar to a bar in the Gantt chart:
* Moving the handle on the left side of the card moves the start date (duration changes).
* Moving the handle on the right side of the card moves the finish date (duration changes).
* Moving the card in the middle moves start and finish date (same duration).
* Ability to drag/drop work packages across assignees to change assignee (specified individually in work package <mention class="mention" data-id="39500" data-type="work_package" data-text="#39500">#39500</mention>).
**I want to** change the date of work packages by drag and dropĀ
**so that** I can do the planning directly inside
**Acceptance criteria**
* Success messages and error handling
* Hover effects for drag and drop
* Moving similar to a bar in the Gantt chart:
* Moving the handle on the left side of the card moves the start date (duration changes).
* Moving the handle on the right side of the card moves the finish date (duration changes).
* Moving the card in the middle moves start and finish date (same duration).
* Ability to drag/drop work packages across assignees to change assignee (specified individually in work package <mention class="mention" data-id="39500" data-type="work_package" data-text="#39500">#39500</mention>).