Content
View differences
Updated by Jens Ulferts about 5 years ago
### **Steps to reproduce:**
1. Go to a project's settings page
2. Change the parent of the project
3. Change the status of the project
4. Click "Save"
5. Reload
### **Actual Behavior**
The change to the parent is kept, the change to the status is lost.
### **Expected Behavior**
Both changes are presisted.
1. Go to a project's settings page
2. Change the parent of the project
3. Change the status of the project
4. Click "Save"
5. Reload
### **Actual Behavior**
The change to the parent is kept, the change to the status is lost.
### **Expected Behavior**
Both changes are presisted.