Content
View differences
Updated by Max Mutzge over 5 years ago
**As** a General user
**I want to** _add 'Estimated Time' - Work package attribute to the time and cost reports filter and include in the report,_
**so that** _I can associate the estimated time vs. spent time for any particular work package in a project by a resource in the selected work period to identify the efficiency of the resource and keep track of work package progress_
**Acceptance criteria**
* _In the Columns and Rows grouping fields drop-down list the Work Package attributes for 'Estimated Time' shall be available._
* When no grouping fields are selected for rows and columns i.e. the default report format, the Estimated Time, and the Status of the work package shall also be included in the report
Sample reference:
<figure class="image op-uc-figure"><div class="op-uc-figure--content"><img class="op-uc-image" src="/api/v3/attachments/20352/content"></div></figure>
**I want to** _add 'Estimated Time' - Work package attribute to the time and cost reports filter and include in the report,_
**Acceptance criteria**
* _In the Columns and Rows grouping fields drop-down list the Work Package attributes for 'Estimated Time' shall be available._
* When no grouping fields are selected for rows and columns i.e. the default report format, the Estimated Time, and the Status of the work package shall also be included in the report
Sample reference:
<figure class="image op-uc-figure"><div class="op-uc-figure--content"><img class="op-uc-image" src="/api/v3/attachments/20352/content"></div></figure>