Content
View differences
Updated by Jens Ulferts over 12 years ago
**As** a user
**I want** to have a table with possible responsibles (y-axis) and work package status (x-axis) and have the project’s work packages grouped into the table’s fields
**so that** I can get an overview of every responsible’s work packages in the project
**Acceptance criteria**
- Analogous to “Assignee” in “Work Packages” -\> “Summary”
**I want** to have a table with possible responsibles (y-axis) and work package status (x-axis) and have the project’s work packages grouped into the table’s fields
**so that** I can get an overview of every responsible’s work packages in the project
**Acceptance criteria**
- Analogous to “Assignee” in “Work Packages” -\> “Summary”