Content
View differences
Updated by Niels Lindenthal over 12 years ago
**QA system**
- Core version: 3.0.0pre33
**Actual behavior**
- Field “Estimated Time” is always displayed in the work package detail view even if no estimated time has been entered.
**Expected behavior**
- Field “Estimated Time” should only be displayed when estimated time has been entered.
**Precondition**
- Module Work package tracking is activated.
- Existing work package (no estimated time specified).
**Steps to reproduce**
1. Go to work packages in left navigation.
2. Select work package detail view.
3. (Estimated time is displayed in work package (even though the field is empty).)
- Core version: 3.0.0pre33
**Actual behavior**
- Field “Estimated Time” is always displayed in the work package detail view even if no estimated time has been entered.
**Expected behavior**
- Field “Estimated Time” should only be displayed when estimated time has been entered.
**Precondition**
- Module Work package tracking is activated.
- Existing work package (no estimated time specified).
**Steps to reproduce**
1. Go to work packages in left navigation.
2. Select work package detail view.
3. (Estimated time is displayed in work package (even though the field is empty).)