Content
View differences
Updated by Robin Wagner almost 9 years ago
**Preconditions**
- Work package module activated.
- Work package(s) with start / due date exist(s).
**Steps to reproduce**
1. Go to work package page and show timeline.
2. Zoom out as far as possible.
3. Scroll to the left.
4. Hover over work packages.
**Actual behavior**
- Label with start date not visible.
**Expected behavior**
- Label with start date visible.
- Possible increase distance to the left (scrollable area to the left of the left-most element) to show labels.
**Screenshot**

**QA system**
- qa.openproject-edge.com
- OpenProject 7.2
- Firefox, Chrome
- Work package module activated.
- Work package(s) with start / due date exist(s).
**Steps to reproduce**
1. Go to work package page and show timeline.
2. Zoom out as far as possible.
3. Scroll to the left.
4. Hover over work packages.
**Actual behavior**
- Label with start date not visible.
**Expected behavior**
- Label with start date visible.
- Possible increase distance to the left (scrollable area to the left of the left-most element) to show labels.
**Screenshot**

**QA system**
- qa.openproject-edge.com
- OpenProject 7.2
- Firefox, Chrome