Updated by Roman Roelofsen almost 9 years ago
**Preconditions**
- Work package module activated.
- Work package without date.
**Steps to reproduce**
1. Activate timeline.
2. Hover over timeline to set date.
3. Drag and drop to increase duration and make sure that mouse cursor stays in same work package line (sometimes “drawn” duration already disappears).
4. While still dragging and dropping reduce duration. - At about a duration of 3 days, the drawn line disappears.
**Actual behavior**
- Drawn line suddenly disappears.
**Expected behavior**
- Drawn line shown.
**Gif**

**QA system**
- qa.openproject-edge.com
- OpenProject 7.2
- Firefox, Chrome
- Work package module activated.
- Work package without date.
**Steps to reproduce**
1. Activate timeline.
2. Hover over timeline to set date.
3. Drag and drop to increase duration and make sure that mouse cursor stays in same work package line (sometimes “drawn” duration already disappears).
4. While still dragging and dropping reduce duration. - At about a duration of 3 days, the drawn line disappears.
**Actual behavior**
- Drawn line suddenly disappears.
**Expected behavior**
- Drawn line shown.
**Gif**

**QA system**
- qa.openproject-edge.com
- OpenProject 7.2
- Firefox, Chrome