Content
View differences
Updated by Marc Burk almost 10 years ago
**Steps to reproduce:**
0\. Create a project and add a user which is in a group
1\. Create a work package
2\. assign a this person as assignee or responsible
3\. save this work package
4\. go to work package list of the project
5\. open the previous created work package in the “full-view” Window
6\. press the edit button in the tool bar
**Actual Behavior**
the dropdown of assignee and responsible shows the group of the user instead of the users name
**Expected Behavior**
the assigned/responsible user should be choosen in the dropdown
0\. Create a project and add a user which is in a group
1\. Create a work package
2\. assign a this person as assignee or responsible
3\. save this work package
4\. go to work package list of the project
5\. open the previous created work package in the “full-view” Window
6\. press the edit button in the tool bar
**Actual Behavior**
the dropdown of assignee and responsible shows the group of the user instead of the users name
**Expected Behavior**
the assigned/responsible user should be choosen in the dropdown