Updated by Robin Wagner about 10 years ago
**Preconditions**
- Work package module activated.
- Work package has several child work packages.
- Work package children have values for inherited attributes assigned (e.g. estimated time, logged time, story points)
**Steps to reproduce**
1. Go to work package list.
2. Make sure attributes are displayed as column in work package list (estimated time, story points).
3. Display sums.
**Actual behavior**
- Wrong sum is shown since values are added for all child work packages and parent work packages (estimated time for children and parent counted twice).
**Expected behavior**
- Sum does not include parent elements (only child elements).
**Screenshot**

Another (extreme) case -\> only the value for the work child work package has been set to 7 and is inherited over 3 hierarchy levels:

**QA system**
- qa.openproject-edge.com
- OpenProject 5.0.13
- Work package module activated.
- Work package has several child work packages.
- Work package children have values for inherited attributes assigned (e.g. estimated time, logged time, story points)
**Steps to reproduce**
1. Go to work package list.
2. Make sure attributes are displayed as column in work package list (estimated time, story points).
3. Display sums.
**Actual behavior**
- Wrong sum is shown since values are added for all child work packages and parent work packages (estimated time for children and parent counted twice).
**Expected behavior**
- Sum does not include parent elements (only child elements).
**Screenshot**

Another (extreme) case -\> only the value for the work child work package has been set to 7 and is inherited over 3 hierarchy levels:

**QA system**
- qa.openproject-edge.com
- OpenProject 5.0.13