Content
View differences
Updated by Jens Ulferts over 10 years ago
**Acceptance criteria**
- inline edit (triggered by click) for a work package’s start/due date
- errors are displayed via the box at the top (default)
- The input field has a hidden label so that it is accessible
**Open**
- See \#\#18404 for the general requirements.
**Open**
\#\#22551
- In the split/full screen, the field is presented as one date field if the work package has a type that is a milestone. How to do it within the table when e.g. only the start-date is displayed.
- inline edit (triggered by click) for a work package’s start/due date
- errors are displayed via the box at the top (default)
- The input field has a hidden label so that it is accessible
**Open**
**Open**