Content
Updated by Joel Small over 9 years ago
It is important to see in a timeline report, which package is in progress and which progress (percentage) it has.
- Requirement 1: Additional graphical part inside the bar or at the end of the package text like “Package Name (45%)”
- Requirment 2: Make it possible to select the percentage data into the column list of a timeline report (see image), so the information is available
as a column in the timeline report.
- Requirement 1: Additional graphical part inside the bar or at the end of the package text like “Package Name (45%)”
- Requirment 2: Make it possible to select the percentage data into the column list of a timeline report (see image), so the information is available
as a column in the timeline report.