Updated by Attila Dombi 12 months ago
### Before filing a report
_Before you file a report, please ensure you are running the latest version of OpenProject and_
_have searched for similar bug reports._
### Steps to reproduce
_Please write down the steps to reproduce. Try to write down all necessary preconditions (what permissions do you have, are other users involved?). Example:_
1. Have 2 phases (A, B) Login as a user with dates set permissions to manage members in project A
2. Clear phase A finish date Go to the members page
3. Clear phase B start date Click on "Add new member"
4. Set phase A Type the whole date range to an
1. **earlier date** than phase B finish date set in step #2.
2. **latter date** than phase B finish date set in step #2.
5. Open the Phase B edit dialog. It will display the default start date and the finish date, but the start date field is not yet set, so it will not appear as completely set.
6. Clicking save on phase B without any modifications will either:
1. set the range correctly. (If 4.a is chosen)
2. display an error message on the disabled start date. (If 4.b is chosen)
following string: "foo@example.org"
### What is the buggy behavior?
_Please describe the bug in as much detail as possible. Example:_
* In case **4.a** the range appears The button to be complete on **phase B**, however the start date is invite a member did not yet stored and we display the default start date only. work
* In case **4.b** There was an error notification shown with the same issue as 4.a on **phase B**, plus it will display a validation error message on the start date being later than the finish date. "XYZ"
### What is the expected behavior?
_Describe how the application should behave like. Example:_
1. \[OPEN\] In case **4.a** not sure, maybe set The application should invite the start date of phase B during new user with the reschedule happening after saving phase A. selected role
2. \[OPEN\] In case **4.b** display the error message on the finish date, because the start date is not editable. But since we set the start date automatically, we An email should have been sent to that user
### Important note
_Please note that unless you are a contributor to OpenProject, you can no longer edit this bug report after saving. You can still add new comments, new images and upload attachments though, but updating description or modifying fields will create an invalid phase, so not be possible after saving. Please make sure what would be that all necessary information and attachments are added, and the right solution here.
following attributes are set:_
### **Logs**
_Are there errors in the browser console? (_[_Click here for information on how to open your browser's console_](https://webmasters.stackexchange.com/a/77337)_) For a local installation: Are there relevant logs output by_ `_openproject logs_` _(packaged installation) (_[_click here for details_](https://docs.openproject.org/installation-and-operations/operation/monitoring/#show-logs)_) or in a log/production.log or /var/log/openproject/ ? Please attach error output in these log files if applicable_
### Screenshots and other files
1. **Setting earlier dates on Phase A than Phase B finish date.**
<img class="op-uc-image op-uc-image_inline" src="/api/v3/attachments/649692/content"> _If you have screenshots of the application's bug behavior or other relevant files, please drag them into this place or attach them using the "Files" section._
### Environment information
_Please check and fill out the following details to help us identify in what versions and distributions of OpenProject the error occurs_
**OpenProject installation type**
* Hosted cloud edition
2. **Setting latter dates on Phase A than Phase B finish date.** * Packaged installation
<img class="op-uc-image op-uc-image_inline" src="/api/v3/attachments/649694/content"> * What distribution?
* Docker All-in-one container
* Docker-compose installation
* Other (please specify)
### **OpenProject version**
_If you're not running on the cloud edition, please specify the version of OpenProject you're running. Example: v12.1.5_
**Browser**
* [ ] Chrome
* [ ] Firefox
* [ ] Safari
* [ ] Mobile Safari
* [ ] Other (please specify)
**Operating System**
* [ ] Windows
* [ ] Mac OS X
* [ ] Mobile iOS
* [ ] Mobile Android
* [ ] Linux (please specify distro)
* [ ] Chrome OS
* [ ] Other (please specify)
**Language**
_Please specify the browser language and the language of the OpenProject user for which the bug occurred._
_Before you file a report, please ensure you are running the latest version of OpenProject and_
_have searched for similar bug reports._
###
2. Clear phase A finish date
3. Clear phase B start date
4. Set phase A
1. **earlier date** than phase B finish date set in step #2.
2. **latter date** than phase B finish date set in step #2.
5. Open the Phase B edit dialog. It will display the default start date and the finish date, but the start date field is not yet set, so it will not appear as completely set.
6. Clicking save on phase B without any modifications will either:
1. set the range correctly. (If 4.a is chosen)
2. display an error message on the disabled start date. (If 4.b is chosen)
* In case **4.b**
### What is the expected behavior?
2. \[OPEN\] In case **4.b** display the error message on the finish date, because the start date is not editable. But since we set the start date automatically, we
### Important note
_Please note that unless you are a contributor to OpenProject, you can no longer edit this bug report after saving. You can still add new comments, new images and upload attachments though, but updating description or modifying fields
_Are there errors in the browser console? (_[_Click here for information on how to open your browser's console_](https://webmasters.stackexchange.com/a/77337)_) For a local installation: Are there relevant logs output by_ `_openproject logs_` _(packaged installation) (_[_click here for details_](https://docs.openproject.org/installation-and-operations/operation/monitoring/#show-logs)_) or in a log/production.log or /var/log/openproject/ ? Please attach error output in these log files if applicable_
###
1. **Setting earlier dates on Phase A than Phase B finish date.**
<img class="op-uc-image op-uc-image_inline" src="/api/v3/attachments/649692/content">
### Environment information
_Please check and fill out the following details to help us identify in what versions and distributions of OpenProject the error occurs_
**OpenProject installation type**
* Hosted cloud edition
2. **Setting latter dates on Phase A than Phase B finish date.**
<img class="op-uc-image op-uc-image_inline" src="/api/v3/attachments/649694/content">
* Docker All-in-one container
* Docker-compose installation
* Other (please specify)
###
_If you're not running on the cloud edition, please specify the version of OpenProject you're running. Example: v12.1.5_
**Browser**
* [ ] Chrome
* [ ] Firefox
* [ ] Safari
* [ ] Mobile Safari
* [ ] Other (please specify)
**Operating System**
* [ ] Windows
* [ ] Mac OS X
* [ ] Mobile iOS
* [ ] Mobile Android
* [ ] Linux (please specify distro)
* [ ] Chrome OS
* [ ] Other (please specify)
**Language**
_Please specify the browser language and the language of the OpenProject user for which the bug occurred._