# Feature SPPM-88 - Global phase administration

Project: Stream Project Portfolio Management
Status: closed
URL: https://community.openproject.org/work_packages/SPPM-88

## Planning

| Attribute | Value |
| --- | --- |
| Date | 2025-06-19 |
| Priority | Medium |
| Target versions | 16.1.0 |
| Votes |  |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Use cases

_No work packages_

## Features and Chunks

| ID | Subject | Type | Status | Assignee | Target versions | Spent time |
| --- | --- | --- | --- | --- | --- | --- |
| SPPM-112 | Introduce Enterprise Banner ViewComponent | Implementation | closed |  | 15.2.0 |  |

## Bugs and other work packages

| ID | Type | Subject | Status | Assignee | Target versions | Spent time | Module |
| --- | --- | --- | --- | --- | --- | --- | --- |
| SPPM-120 | Task | Set enterprise banner url when documentation page is ready | closed |  | 16.1.1 |  |  |
| SPPM-126 | Bug | When opening the project administration menu, redirection is not on Project Lifecycle | closed |  |  |  |  |

## Technical Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Feature Flag |  |
| Requires doc change | Yes |
| Enterprise plan | Enterprise / Premium (PRE) |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable | Ivan Kuchin |
| Product manager |  |
| Feature Lead |  |
| Developers | OP Dev Polaris Team |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

**As** an administrator  
**I want to** CRUD the possible gates/stages   
**so that** I can deviate from the default to reflect the process in place in my organization.

Assumes <mention class="mention" data-id="58159" data-type="work_package" data-text="###58159">###58159</mention> is done.

**Acceptance criteria**

- [x] Visualization similar to project attributes.
- [x] A new menu is added to "Administration -\> Projects" labeled "Project lifecycle".
- [x] Within this administration, all currently existing stages and gates are listed.
  - [x] The name and type (stage/gate) is displayed in a table.
    - [x] The type (rhombus for gate, arrow for stage) are displayed in the color defined for the stage/gate.
    - [x] The number of projects the stage/gate is active in is displayed.
  - [x] They are listed in an order.
  - [x] The administrator can change the order.
- [x] The administrator can create a new stage/gate.
  - [x] Select a name.
  - [ ] ~~Select the type.~~ (done by choosing which type of step to create)
  - [x] Select the color.
- [x] The administrator can change an existing stage/gate.
  - [x] Change the name.
  - [x] Change the color.
- [x] The administrator can remove a stage/gate.
- [x] This functionality is only available in EE. A banner is shown in case the instances is not EE.
  - [x] Technical note: A new type of banner is to be developed for this as a ViewComponent (see Figma).
- [x] Adding a stage will not directly enable it in all projects.
- [x] The new functionality is hidden behind the feature flag developed as part of <mention class="mention" data-id="58159" data-type="work_package" data-text="###58159">###58159</mention>.

Out of scope

  - Ability to enable/disable a stage/gate from the global administration.

  - Removing a stage/gate will not lead to the other stages/gates being rescheduled.

Figma

<https://www.figma.com/design/4Z950sfYbceOqUN6sFV7Mr/Project-management%3A-Stages-and-Gates?node-id=1-28338&amp;node-type=frame&amp;t=zHPVdAjjO2zxPToR-0>