# Feature SPAR-81 - Status-based progress mode: Allow users to freely input % complete values for statuses

Project: Stream Planning and Reporting
Status: closed
URL: https://community.openproject.org/work_packages/SPAR-81

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | 14.4.0 |
| Votes |  |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Use cases

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Feature Flag |  |
| Requires doc change | Yes |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Build Number |  |
| Found in mobile app version |  |
| Follow-up feedback e-mail |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable | Christophe Bliard |
| Product manager |  |
| Feature Lead |  |
| Developers |  |
| Designer | Parimal Satyal |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

**As** a project administrator  
**I want to** be able to input freely input % Complete values for each status  
**so that** I am not limited by 10-percent increments

**Acceptance criteria**

*   In status-based progress calculation mode, in _Administrator_ → _Work packages_ → _Statuses_ → _{any status},_
    
*   For the % Complete field,
    
    *   Replace the drop-down offering 10-percent increments with
        
    *   A free integer text input with in-line validation (values between 1 and 100)
        
    *   Only integer values are allowed
