# Bug SPAR-142 - Icon beside dates of a relation is wrong in relation row

Project: Stream Planning and Reporting
Status: closed
URL: https://community.openproject.org/work_packages/SPAR-142

## Open points

_No work packages_

## Details

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Module |  |
| Target versions | 15.3.0 |
| Observed in versions |  |
| Bug found in version (deprecated) |  |
| Requires doc change | No |
| Accessibility | No |
| Pull preview |  |
| List |  |
| Labels |  |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable | Behrokh Satarnejad |
| Product manager |  |
| Developers |  |
| Designer | Parimal Satyal |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Planning

| Attribute | Value |
| --- | --- |
| Relevance |  |

## Costs

| Attribute | Value |
| --- | --- |
| Votes |  |
| Work |  |
| Labor costs |  |

## Description

### Steps to reproduce

1.  Login as a user with permissions to visit/edit WPs

2.  Go to the WPs page

3.  Select a WP which has successor or predecessor relation

### What is the buggy behavior?

  - Icons are wrong:

  - Predecessor: pin

  - Successor: calendar

### What is the expected behavior?

1.  The icon should be pin, if the related work package is manually scheduled. For all others, we'll use the standard calendar icon.