# Bug OP-9879 - Inconsistencies and an anomaly with borders on team planner calendar

Project: OpenProject
Status: closed
URL: https://community.openproject.org/work_packages/OP-9879

## Open points

_No work packages_

## Details

| Attribute | Value |
| --- | --- |
| Date | 2021-11-01 – 2022-02-27 |
| Priority | Medium |
| Module |  |
| Target versions | 12.1.0 |
| Observed in versions |  |
| Sprint | 12.1.0 |
| Backlog bucket |  |
| Bug found in version (deprecated) |  |
| Found in mobile app version |  |
| Follow-up feedback e-mail |  |
| Requires doc change | No |
| Accessibility | No |
| Pull preview |  |
| List |  |
| Labels |  |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Planning

| Attribute | Value |
| --- | --- |
| Relevance |  |

## Costs

| Attribute | Value |
| --- | --- |
| Votes |  |
| Work |  |
| Labor costs |  |

## Description

### Environment

Edge

### Steps to reproduce:

Load team planner

### Current behaviour

With the changes to the background colour of the team planner (with <mention class="mention" data-id="40962" data-type="work_package" data-text="#40962">\#40962</mention>), a few anomalies have cropped up:

  - The border colour of cells of the calendar are different in different places (notably header and assignee column vs day cells).

  - There is a one-pixel white strip next to the assignee column (that cuts into the first day column, *13 Sunday* in the screenshot below).

<figure class="image op-uc-figure"><div class="op-uc-figure--content"><img class="op-uc-image" src="/api/v3/attachments/27515/content"></div></figure>

### Expected behaviour

  - Make all borders the same colour (Basic/Gray 4: \#cccccc). 
  - Remove the 1px white strip next to the assignee column.
