# Epic OP-9051 - Weekly status email

Project: OpenProject
Status: new
URL: https://community.openproject.org/work_packages/OP-9051

## Detailed specification

### Motivation and background information

### Acceptance criteria

### Out of scope

| Attribute | Value |
| --- | --- |
| Mockups |  |

## Planning

| Attribute | Value |
| --- | --- |
| Roadmap |  |
| Date |  |
| Votes |  |
| List |  |
| Target versions | Wish List |
| Sprint |  |
| Backlog bucket |  |
| Relevance |  |

## Subitems

_No work packages_

## Bugs and other work packages

_No work packages_

## Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Enterprise plan |  |
| Labels |  |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Designer |  |
| Developers |  |
| Requested by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| Work |  |

## Description

**As a** project member,  
**I want to** receive an overview of the changes that happened during the week in the projects I’m working on  
**so that** I can see what is the status per project and act if there is something that requires my attention

**Note**  
This is a UI work package (email design) and basic logic (links). The backend logic of the settings are set at #

**Visuals**

<figure class="image op-uc-figure" style="width:75%;"><div class="op-uc-figure--content"><img class="op-uc-image" src="/api/v3/attachments/22157/content"></div></figure>

<figure class="image op-uc-figure" style="width:75%;"><div class="op-uc-figure--content"><img class="op-uc-image" src="/api/v3/attachments/22158/content"></div></figure>

**Acceptance Criteria**

*   This email should contain all changes that happened during the last week organised by project.
*   The header should include:
    *   Logo of Open project.
    *   Salutation with the name of the user.
    *   Information: “This past week”, “X” updates on in “X” Work Packages in “X” projects.
*   The content should be divided in cards organised by project:
    *   Header:
        *   Project Name.
        *   Changes that happened in that project.
        *   Badge in the right top corner.
    *   Body: Work package rows with status, ID (clickable), type, Name and change applied to this work package (single line).
*   A button with a link to the email settings is displayed at the end of the email.
*   _There is a need to check if we need to include any legal text (unsubscribe when you don’t have access to your account for example)._

**Mockups in Figma**  
Email view: https://www.figma.com/file/U1HmbSd1VDwC24XkSrkGgS/Notification-Center-Email-Design?node-id=825%3A490

Complete view: https://www.figma.com/file/U1HmbSd1VDwC24XkSrkGgS/Notification-Center-Email-Design?node-id=834%3A729
