# Feature OP-9011 - Resource assignee on work packages as part-time/percentage

Project: OpenProject
Status: new
URL: https://community.openproject.org/work_packages/OP-9011

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | Wish List |
| Sprint |  |
| Backlog bucket |  |
| Votes |  |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Feature Flag |  |
| Requires doc change | No |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

**As** a project manageer  
**I want to** assign on a work package a resource with a percentage \[0%-100%\]  
**so that** 

*   it reflects his real loading on the work package
*   permit the assignee to be assigned on multiple activities in parallel
*   the calculated duration/finish date of the work package depends on the % allocated.
*   (wish) a possible future resource allocation cockpit is reflecting resource bottlenecks &amp; overloading situations. 

**Acceptance criteria**

*   _\[enter acceptance criteria\]_
*   _..._