# Feature OP-8870 - Link Attachments to Cost Entries

Project: OpenProject
Status: new
URL: https://community.openproject.org/work_packages/OP-8870

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | Wish List |
| Sprint |  |
| Backlog bucket |  |
| Votes | 0 |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Feature Flag |  |
| Requires doc change | No |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

**As** a user  
**I want to** have the ability to link cost entries to attachments and documents when logging costs  
**so that** it is easier to access receipts and other associated documents when reviewing cost reports.

**Acceptance criteria**

*   When adding/editing cost entries in a work package, the list of all attachments from the current work package should be (multi) selectable for linking/associating with the current cost entry.
*   Linking attachments is optional
*   Multiple attachments can be associated with one cost entry.
*   Multiple cost entries can be associated with one attachment.
*   External links (or links to elsewhere within OpenProject) should also be supported
*   Attempts to remove any attachment linked to a cost entry should be receive a verification prompt (configurable).
