# Feature OP-8869 - Allow Credits Back to Budgets

Project: OpenProject
Status: new
URL: https://community.openproject.org/work_packages/OP-8869

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | Wish List |
| Sprint |  |
| Backlog bucket |  |
| Votes | 1 |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Feature Flag |  |
| Requires doc change | No |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

**As** a User  
**I want to** have the ability to credit/reverse charges back to budgets  
**so that** it will facilitate transactions such as returns or applied discounts (applied after the original transaction)

**Acceptance criteria**

*   Costs/charges should be able to be credited back to a budget (as opposed to simply changing the original cost applied) from within a work package, so that the full transaction history can be traced in the cost report.
*   Credits should be displayed in cost reports as a different color than costs (assumedly green and red, respectively).
*   This is NOT a means of adding _NEW_ funds to a budget, only for restoring all or partial costs from a previously logged cost.
    *   As such, linking each credit entry to a previous costs entry should be required, and should not be allowed to exceed the original cost amount.

**Background**

I track costs by adding PDFs of my receipts to a work package, and then logging the cost.  However, sometimes the same day, sometimes days or weeks later, I return products and receive a refund that can be directly applied back to my budget.  Currently, I have to go back to the original cost entry and adjust the original value.  This causes a lot of ambiguity when trying to match cost entries to receipts, as well as find returns.  I am manually adding A LOT of notes into the comment field for such transactions.