# Feature OP-8287 - option to exclude progress value calculation (for EVA reports)

Project: OpenProject
Status: new
URL: https://community.openproject.org/work_packages/OP-8287

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | Wish List |
| Sprint |  |
| Backlog bucket |  |
| Votes |  |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Feature Flag |  |
| Requires doc change | Yes |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

**As** a project manager  
**I want to** control the progress bar calculation by excluding Work packages (by type or status)  
**so that** the progress value can be use for EVA reports. Each additional work package will change the progress bar, even that work package is just a little task or a reminder for a person.

Instead of moving those task into a separate phase or topic, the task should be marked as &quot;exclude from progress&quot; or similiar.

**Acceptance criteria**

*   option to exclude a work package from progress calculation
*   done by a status or an boolean option at the work package