# Feature OP-8043 - Display aggregated spent time of child work packages in Time and cost module for parent work package | summed up spent time

Project: OpenProject
Status: new
URL: https://community.openproject.org/work_packages/OP-8043

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | Wish List |
| Sprint |  |
| Backlog bucket |  |
| Votes | 5 |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Feature Flag |  |
| Requires doc change | Yes |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

**As** an OpenProject user  
**I want** to access a list of the logged times of child work packages as well as of their parent work package from or within the respective parent work package  
**so that** I can control and manage spent time for e.g. a phase on an aggregated level.

**As** an OpenProject user  
**I want** to see all logged times of associated child work packages at one place  
**so that** I can control the budgets on the level of parent work packages only.

### Possible solution

When accessing the Time and cost module via Spent time of a work package: Set a filter that includes the parent work package and all its children and the display the logged spent time entries.

### **To be discussed**

  - should this be also available for spent costs?

### Current behavior

There's no easy way to access an overview of the spent time of each child work package. The hours are added up, but there's no overview (Screenshots: looking for one in the Time and cost module).

<figure class="image op-uc-figure" style="width:50%;"><div class="op-uc-figure--content"><img class="op-uc-image" src="/api/v3/attachments/20079/content"></div></figure>

<figure class="image op-uc-figure" style="width:50%;"><div class="op-uc-figure--content"><img class="op-uc-image" src="/api/v3/attachments/20080/content"></div></figure>

<figure class="image op-uc-figure" style="width:50%;"><div class="op-uc-figure--content"><img class="op-uc-image" src="/api/v3/attachments/20081/content"></div></figure>

###
