# Feature OP-7890 - Allow cross-project budgets

Project: OpenProject
Status: new
URL: https://community.openproject.org/work_packages/OP-7890

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | High |
| Target versions | Wish List |
| Sprint |  |
| Backlog bucket |  |
| Votes | 60 |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Feature Flag |  |
| Requires doc change | No |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

**As** a project manager using OpenProject  
**I want** to be able to assign work packages to a budget from a different project  
**so that** I can use a single (main) project for planning a budget.

**Acceptance criteria**

*   Budgets should be shareable across projects (similar to versions).
*   Display aggregated values (cost, time) in root budget (which can be located in the main project).
*   It should be possible to assign work packages from (sub-)projects to a budget in a different project.

**Assumptions / details**

_**Assumption**: Only sharing with sub-projects is supported. This is different from versions where sharing with the tree, the whole installation, etc. is also possible. Sharing with the sub-projects will share it with **all** sub-projects. It is not possible to exclude individual ones._  
_**Assumption**: The Budgets should be displayed as a budget of the sub-project (Project menu -&gt; Budgets). They are editable in the sub-project if the user has the_ `_manage_budgets_` _permission in the budget’s native project._  
_**Assumption**: It is possible to assign work packages to budgets native to or shared with the project. Such budgets should be displayed differently in the list of assignable budgets (e.g. “\[project name\] - \[budget name\]”) on the work package edit form and on show._  
_**Assumption**: Cost reports groups work packages assigned to the budget as one when choosing to group by budget even if they are in a different project._  
_**Assumption**: The cost control module has to be enabled in a sub-project for the field to appear in the work package edit form and show._

_**Unclear / tbd**_  
_As a user’s hourly rates may differ per project, which rate is to be assumed to be the authoritative one when planning?_