# Feature OP-7889 - Make description of work package attributes for Estimates and Time consistent

Project: OpenProject
Status: rejected
URL: https://community.openproject.org/work_packages/OP-7889

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | Product Backlog |
| Sprint |  |
| Backlog bucket |  |
| Votes |  |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Feature Flag |  |
| Requires doc change | Yes |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee | Christophe Bliard |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

In the Estimates and Time section of the work package form **change the names of these attributes**  
*English:*  
\-"Remaining hours" to "Remaining time"  
*(German:*  
\-"Aufgewendete Zeit" to "Bisheriger Aufwand"  
\-"Verbleibende Stunden" to "Verbleibender Aufwand")  
to make the naming more consistent.   
<br></br>
\[Good to know:   
-To make the unit (at the moment: hours) more clear when populating the attribute fields there's this feature request: <mention class="mention" data-id="35503" data-type="work_package" data-text="#35503">#35503</mention>.  
\-"Remaining hours" is set manually at the moment, as this is part of the backlogs module, used for agile project management. The idea is that this attribute specifies how much effort/time still needs to be put in rather than how much "time budget" is left.  
-However, there's a feature request (<mention class="mention" data-id="22800" data-type="work_package" data-text="#22800">#22800</mention> ) to calculate the Remaining hours as difference between Estimated time and remaining hours. ] 

<br></br>

### Current behaviour

English: 2 different ways of naming the attributes

<figure class="image"><img src="/api/v3/attachments/19719/content"></figure>

German: 3 different ways of naming the attibutes

<figure class="image"><img src="/api/v3/attachments/19720/content"></figure>
