# Feature OP-7595 - Enable manual scheduling of parent work packages directly from within Gantt chart

Project: OpenProject
Status: in specification
URL: https://community.openproject.org/work_packages/OP-7595

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | Wish List |
| Sprint |  |
| Backlog bucket |  |
| Votes | 2 |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Feature Flag |  |
| Requires doc change | Yes |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee | Niels Lindenthal |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

**As** a project manager  
**I want** to easily and quickly schedule parent work packages directly from the Gantt chart  
**so that** I don't have to open the date picker to plan parent work packages.

Current behavior (scheduling parent work packages only possible through date picker):

<figure class="image"><img src="/api/v3/attachments/19093/content" alt=""></figure>

**Acceptance criteria**

  - When planning a project from the Gantt chart it should be possible to easily switch from the automatic to the manual scheduling mode.
      - E.g. when there is a parent work package (manual scheduling mode), it should ideally be possible to set the start and finish date from the Gantt chart and switch over to the manual scheduling mode.
      - Alternatively (or additionally) it should be possible to switch between the manual and automatic scheduling mode (e.g. using the context-menu on work packages).

**Technical notes (for adding option to switch between manual and automatic scheduling mode):**

<figure class="image"><img src="/api/v3/attachments/19223/content"></figure>

**Note**

  - The original issue reported in this feature (as also shown in the Gif) is tracked as a bug in <mention class="mention" data-id="34710" data-type="work_package" data-text="#34710">#34710</mention>.
