# Feature OP-6647 - Show the estimated time per task on the cost report 

Project: OpenProject
Status: new
URL: https://community.openproject.org/work_packages/OP-6647

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | Wish List |
| Sprint |  |
| Backlog bucket |  |
| Votes | 3 |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Feature Flag |  |
| Requires doc change | Yes |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

**As** a project manager  
**I want** to display the estimated time per work package in the Time and cost module (cost report)  
**so** that I can easily compare the estimated time vs. the spent time for a given period.

**As** a General user  
**I want to** *add 'Estimated Time' - Work package attribute to the time and cost reports filter and include in the report,*  
**so that** *I can associate the estimated time vs. spent time for any particular work package in a project by a resource in the selected work period to identify the efficiency of the resource and keep track of work package progress*

**Acceptance criteria**

  - *In the Columns and Rows grouping fields drop-down list the Work Package attributes for 'Estimated Time' shall be available.*
  - When no grouping fields are selected for rows and columns i.e. the default report format, the Estimated Time, and the Status of the work package shall also be included in the report
  - In addition to the Estimated Time, Status of the work package, please also add the column - Total Spent Time, so the report will display the Work package, Status, Estimated Time, Total Spent time (including the selected period spent time), Selected period Spent time.

Sample reference:

<figure class="image op-uc-figure"><div class="op-uc-figure--content"><img class="op-uc-image" src="/api/v3/attachments/20352/content"></div></figure>