# Feature OP-5946 - Workpackage dates to inherit assigned version dates

Project: OpenProject
Status: new
URL: https://community.openproject.org/work_packages/OP-5946

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | Wish List |
| Sprint |  |
| Backlog bucket |  |
| Votes | 2 |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Feature Flag |  |
| Requires doc change | No |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

As we are assigning workpackages to versions with start and end dates, it would be very useful if workpackages with default or no start and end dates could inherit the version start and/or end dates e.g. in the Gantt chart view.

I think it's desirable that a workpackage that has had specific dates set doesn't change, but a way to make the dates conform to the version if they are outside the version start and end dates would make sense (particularly in a bulk edit view, as we move workpackages that aren't going to get done in time to a later version).

My first guess is that this would be best set as an option to the version.  A button to set all workpackages in the version to have dates within the version date range might also live in the edit page for the version.