# Feature OP-20516 - Configurable metric for burndown chart

Project: OpenProject
Status: new
URL: https://community.openproject.org/work_packages/OP-20516

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | Wish List |
| Sprint |  |
| Backlog bucket |  |
| Votes | 2 |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module | Modules and project features / Boards |
| Feature Flag |  |
| Requires doc change | No |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

**As** a project admin  
**I want to** configure which metric shall be used for the burn down chart of a sprint  
**so that** I can decide if the chart is based on the estimated time vs the spent time or if it is based on the story points like it is currently.

**Acceptance criteria**

*   The project settings provide an option to configure, which metric shall be used for the burn down chart of a sprint.
*   The time based burn down chart shows the progress using the estimated time and the spent time for tasks

The burn down chart based on the story points is currently not very helpful in order to keep track of the team velocity, since the BLIs usually are getting closed near the end of the sprint.

A time based chart would improve the evaluation of the team velocity.