# Feature OP-20039 - Add/edit/remove roles for several projects at once on a group, instead of one project at a time (bulk-edit)

Project: OpenProject
Status: new
URL: https://community.openproject.org/work_packages/OP-20039

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | Wish List |
| Sprint |  |
| Backlog bucket |  |
| Votes | 1 |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module | Administration / Roles and permissions |
| Feature Flag |  |
| Requires doc change | No |
| Enterprise plan | Enterprise / Premium (PRE) |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

**As** an admin  
**I want to** add or edit roles for multiple projects on a group in one action  
**so that** setting up a group&#x27;s project access doesn&#x27;t take one manual step per project

**Why**

Today, roles can only be added to a group one project at a time: pick a project, add a role, repeat. For a group that needs access to many projects, this turns into a lot of repetitive manual work.

**Current behaviour**

Admin → Groups → edit group → _Projects_ tab: exactly one project can be selected, then a role added to it, then the next project has to be done the same way. No way to apply a role to several projects in one go, and no way to edit several existing project/role rows at once.

**Proposed behaviour**

*   **Add:** in the &quot;add project&quot; field, select multiple projects at once, plus one or more roles; all selected projects are added with those roles in one action.
    
*   **Edit existing:** in the group&#x27;s existing project list, each row gets a checkbox (plus &quot;select all&quot;). Selecting several rows and choosing a role applies that role to all of them in one action.
    
*   **Remove:** using the same row checkboxes, selected rows can be removed in one action.
    

**Acceptance criteria**

1.  Projects tab &quot;add&quot; field supports selecting multiple projects at once.
    
2.  Adding N projects with M roles selected creates N rows, each with all M roles applied.
    
3.  Each row in the existing project list has a checkbox, plus &quot;select all&quot;.
    
4.  Applying a role to a multi-row selection adds that role to every selected row in one action.
    
5.  A multi-row selection can be removed (unassigned from the group) in one action.
    
6.  Single-project add/edit (today&#x27;s behaviour) still works unchanged.
    
7.  Only projects the group isn&#x27;t already a member of are offered when adding.
    

**Technical notes**

*   Reuse existing membership create/update/destroy logic per row — this is a UI batching layer, not a new permission model.
    

**Permissions and visibility considerations**

*   _To whom is this feature visible? admins_
    
*   _When is it not visible? outside the administration view_
    

**Translation considerations**

*   _Key terms and phrases in the key languages_&nbsp;
    

**Out of scope**

*   Bulk actions across multiple groups at once.
    
*   Bulk editing from the project&#x27;s own Members page.
    

_Set the_ **To be informed/consulted teams** _field to include all teams necessary to be informed of the changes._