# Feature OP-18368 - Allow child relation for milestones

Project: OpenProject
Status: new
URL: https://community.openproject.org/work_packages/OP-18368

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | Wish List |
| Sprint |  |
| Backlog bucket |  |
| Votes | 1 |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module | Modules and project features / Relations and scheduling |
| Feature Flag |  |
| Requires doc change | No |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers | OP Dev Sirius Team |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

**As** a project manager  
**I want to** add checklist item subpackages to a milestone  
**so that** I can track the fulfilment and acceptance of a quality gate.

As an example:

We use a work package type called "Quality Gate", which is a milestone to define fixed approval votes within a project (e. g. Go-Live acceptance, Beta Go-Live acceptance,...). Underneath this Quality Gate, there would be so-called "Prüfpunkt" (checklist item) work packages with an accountable person for this checklist item and a workflow that only allows this person to move the status to "approved", therefore documenting the decision. We want to use a milestone instead of a regular work package, as the Quality Gate has one fixed acceptance date, and it should appear as a milestone in the Gantt chart (diamond instead of bar). Other relationship types are more difficult to create on the fly (e. g. via a work package filter) and won't show up in a hierarchy view. And a checklist in the description allows too many people to change the vote without enforcing strict guidelines.

**Acceptance criteria**

  - child relation is allowed for work packages of the type milestone

  - alternative: add a quality gate work package type with checklist items and a simple workflow for these items to track approvals. As an example from SAP Cloud ALM:
    
      - 
        <img class="image_resized op-uc-image op-uc-image_inline" style="width:665px;" src="/api/v3/attachments/916745/content">

**Technical notes**

  - There are several bugs detailing the removal of this feature, but it's not stated why milestones shouldn't have a child relation. It also doesn't seem to be documented. At least I couldn't find it in the documentation.

**Permissions and visibility considerations**

  - \-

**Translation considerations**

  - \-

**Out of scope**

  - \-
