# Feature OP-18064 - % complete chart widget on project overview (including historic data)

Project: OpenProject
Status: in specification
URL: https://community.openproject.org/work_packages/OP-18064

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | Wish List |
| Sprint |  |
| Backlog bucket |  |
| Votes |  |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module | Modules and project features / Progress and work estimates, Modules and project features / Project overview |
| Feature Flag |  |
| Requires doc change | Yes |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers | OP Dev Sirius Team |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

**As** a project administrator  
**I want to** have a pie/bar chart of the completed work packages (configurable filters) at a configurable time  
**so that** I can use that to report the progress compared to e.g. last month

**Acceptance criteria**

*   Have a &quot;% complete&quot;-widget for the overview/dashboard project page
    
    *   % complete would be the weighted % over all work packages matching the configured filter (just like the group sum displayed in the work package table)
        
    *   The user can configure the timestamp (or multiple timestamps to display multiple graphs in the widget) for which the graph should featch the data (similar to the baseline feature)&nbsp;
        

**Technical notes**

*   <br>
    

**Permissions and visibility considerations**

*   Users having the ability to see work packages in the project
    

**Translation considerations**

*   _Key terms and phrases in the key languages_ 
    

**Out of scope**

*   <br>
    

_Set the_ **To be informed/consulted teams** _field to include all teams necessary to be informed of the changes._