# Feature OP-17984 - Manage the availability of relation-options for work packages

Project: OpenProject
Status: new
URL: https://community.openproject.org/work_packages/OP-17984

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | Wish List |
| Sprint |  |
| Backlog bucket |  |
| Votes | 1 |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Feature Flag |  |
| Requires doc change | No |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

As a system administrator or project administrator, I would like to be able to disable some of the available work package relationships individually for projects or globally, so that only the work package relationships that are to be used can be selected. Example: Predecessors and successors. Relationships should be selectable, blocked by and blocks relationships should no longer be selectable. I would therefore like to be able to limit the long list of work package relationships to those relationships that my employees are to use.
