# Feature OP-17437 - Turn agenda items into work packages

Project: OpenProject
Status: rejected
URL: https://community.openproject.org/work_packages/OP-17437

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | High |
| Target versions | Product Backlog |
| Sprint |  |
| Backlog bucket |  |
| Votes |  |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module | Modules and project features / Meetings, Modules and project features / Work packages |
| Feature Flag |  |
| Requires doc change | Yes |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups | https://www.figma.com/design/cJDhzOmYMstUNRS3EmgqZ0/Meetings-Module?node-id=4861-1002 |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee | Mir Bhatia |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers | OP Dev Sirius Team |
| Designer | Parimal Satyal |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

**As** a meeting faciliator or participant  
**I want to** be able to convert an agenda item into a work package  
**so that** I can easily make agenda items actionnable in a project context

**Acceptance criteria**

  - Add a new option in the 'More' menu of basic agenda items
    
      - Label: "Convert to work package"
    
      - Leading icon: `op-work-packages`

  - When this option is clicked, open a work package creation dialog
    
      - Use the existing dialog for creating a new child
        
          - The subject should be the title of the agenda item
        
          - The type should be pre-selected as the first item on the list
        
          - The description should be the text of the note
            
              - If meeting outcomes exist, they should be appended to the description
        
          - Only the basic and required fields should be present
            
              - Basic fields include: type, subject, description
            
              - Other non-required fields (status, priority, version...) are not present

  - After the user clicks on 'Create work package', the modal is closed
    
      - The work package should be created in the project meeting belongs to
    
      - The agenda item is converted to a work package agenda item
        
          - \[open\] *Do we still display the agenda item notes (now the description of the work package) as is? Pro: the user has the current context; Con: duplication.*
            
              - *Possible solution: include the work package description as a macro?*

**Technical notes**

  - 
    <br>

**Permissions and visibility considerations**

  - None

**Translation considerations**

  - New string: 'Convert to work package'

**Out of scope**

  - to be explroed