# Feature OP-16568 - Non-working days at project level

Project: OpenProject
Status: new
URL: https://community.openproject.org/work_packages/OP-16568

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | Wish List |
| Sprint |  |
| Backlog bucket |  |
| Votes | 3 |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Feature Flag |  |
| Requires doc change | No |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

**As** a \[administrator or project administrator\]  
**I want to** \[manually configure non-working days for each project individually.\]  
**so that** \[different non-working days are respected in the planning of work packages for each project\]

##### **Reason:**

There is a need to define project specific non-working days. For example country-specific holidays or general non-availability of resources during a certain period. These non-working days are not the same for all projects and therefore a global non-working day definition is not sufficient. Currently, we do not see a workaround (except using MS Project 🤐 )

**Acceptance criteria**

  - non-working days can be defined for a specific calendar

  - this calendar can be linked to a specific project

  - non-working days defined in this specific calendar are respected for the planning of work packages

**Technical notes**

  - Global setting of non-working days is possible (see <mention class="mention" data-id="41226" data-type="work_package" data-text="#41226">\#41226</mention> ) 

  - 
    
    <br>

**Permissions and Visibility considerations**

  - *Configuration of non-working days should be possible for administrator/project administrator only*

  - *Defined non-working days shall be visible for everyone in the project*

**Out of scope**

  - <mention class="mention" data-id="49874" data-type="work_package" data-text="#49874">\#49874</mention> Non-working-days at an individual user-level is different and more specific, it is related to "users" not "project"