# Feature OP-15714 - Possibility to add a delta time (in days) to a predecessor / successor relationship

Project: OpenProject
Status: closed
URL: https://community.openproject.org/work_packages/OP-15714

## Planning

| Attribute | Value |
| --- | --- |
| Date |  |
| Priority | Medium |
| Target versions | Wish List |
| Sprint |  |
| Backlog bucket |  |
| Votes | 1 |
| List |  |
| Roadmap |  |
| Relevance |  |

## OPEN POINTS / FEEDBACK

_No work packages_

## Features and Chunks

_No work packages_

## Bugs and other work packages

_No work packages_

## Technical Details

| Attribute | Value |
| --- | --- |
| Module |  |
| Feature Flag |  |
| Requires doc change | No |
| Enterprise plan |  |

## Details

| Attribute | Value |
| --- | --- |
| Pull preview |  |
| Mockups |  |
| Accessibility | No |

## People

| Attribute | Value |
| --- | --- |
| Assignee |  |
| Accountable |  |
| Product manager |  |
| Feature Lead |  |
| Developers |  |
| Designer |  |
| Ordered by |  |
| Signed off by |  |
| Interest by |  |

## Estimates and progress

| Attribute | Value |
| --- | --- |
| PD (min) |  |
| PD (max) |  |
| Work |  |
| Labor costs |  |

## Description

(I was not able to find the same request on the forum, which is strange, so if it already exist please link it to me and I'll give my vote)

**As** a Project Manager  
**I want to** add the the relationship a delta time in days (+ or -) respect to the connected date (predecessor / successor)  
**so that** I can manage better our schedule

**Acceptance criteria**

  - from a relationship I can add a different -X or +X date to the start-end relationship